This blog belongs to a series of blogs regrouped on the SCN page “SAP PLM Recipe Development for Beginners”.
PLM stands for Product Lifecycle Management. The lifecycle of a product is usually its design > creation > launch > optimization > obsolescence. These phases somehow have to be managed in the SAP system, for example with corresponding system statuses.
So the question arises: "How can you manage the lifecycle of a product, across all objects, with SAP Recipe Development? What are the system capabilities? What are the options?"
Before we can answer this question, we should first take a look at the most relevant objects that SAP Recipe Development is dealing with. Those are:
Let’s now take a closer look at those objects one by one. Let’s try to understand how the lifecycle can be managed individually on each of those objects.
Material
In the SAP Material Master is a field “X-plant material status”. This field is often used to manage the lifecycle of the material also in the context of SAP RD.
SAP Material Master - SAP GUI on the left and SAP WEB-UI on the right
Specification
As far as the specification is concerned here we have several possible ways of managing the lifecycle:
Specification identifier for status indication
If you want to keep it simple and if all you need is an indicator if your specification is “in creation” or “released” you might consider using an additional identifier for this purpose. It is simple but there is no control mechanism whatsoever on the specification and its usage.
EHS Specification Status
If you are working with different ratings, usages, regions, … the EHS Specification Status might be exactly what you need. This status does not only allow to control the behavior of the specification (“editable” when “in process” and “non editable” when “released”) but is also integrated with SAP ECN (Engineering Change Numbers). This allows you to manage the time span when a certain status is valid.
Example:
RD Specification Header Status
If you are mainly concerned that the specification status works seamlessly in conjunction with the recipe, you might be in favor of using the Specification Header Status. This status does not only dispose of status network which is based on the same configuration and integration logic the status of the recipe but also allows to make use of so called “attributes”.
Those attributes do not only allow to manage the behavior of the specification itself (e.g. editable or not editable) but also its usage in other objects (e.g. a specification on status “obsolete” cannot be used as a new input item in a recipe).
Recipe
When you create a recipe you quickly find out that the recipe does not have an own independent number range. Instead, the recipe number is composed of:
So, in addition to the recipe status, which allows to manage the behavior of the recipe (editable, non-editable) and also allows to trigger so called recipe consistency checks, the recipe.
Optionally, you can also enable the use of change number for recipes of a specific recipe type in SPRO (ECN for Recipes).
BOM
The Bill of material also has a status and also allows the use of Engineering Change Numbers (ECN). When a Recipe is synchronized via the GSS-tool (GSS Recipe to BOM Synchronization) it is mandatory to use an ECN for this synchronization.
If a new recipe version with a new ECN (and corresponding new validity date) is synchronized to the same BOM (where the predecessor recipe version was earlier already synchronized), the positions in the BOM / Recipe which have been changed during this synchronization are automatically updated in the BOM.
ECR
The Engineering Record (SAP component PLM-WUI-OBJ-ECR) is an additional, optional object which allows to group several other objects in one ECR. The ECR is an umbrella which can contain several specifications, recipes, materials,… which are all related to the same product development project.
Without ECR, the product development project manager would probably list all objects (specifications, recipes, …) in one excel sheet. This excel sheet would be updated by his team members, a status per item would be tracked and they would send the excel file back and forth by email. Finally, after the successful ending of the project, they might try to save the excel file in a non-editable format (e.g. pdf file) and archive it somewhere. That is in short the function of the ECR.
And, yes, the ECR also has its own status field and status network. This status network does not only manage the behavior of certain field and columns in the ECR (e.g. “editable” on status “in work” and “not editable” on status “released”), but also allows to trigger events such as integrated workflows.
Lifecycle integration across all objects
There is no golden path, no right or wrong! What is needed is a thorough evaluation of the pros and cons of each of the above listed options.
Therefore, in every SAP Recipe Development implementation you have to ask yourself:
After those questions have been clarified, you will be a step closer to an integrated product lifecycle management for your SAP Recipe Development solution. And, you might also want to start thinking about Recipe Development mass change scenarios.