What’s new in Production Accounting in SAP S/4HANA Cloud?
In this blog post we’ll explore the recent changes in Production Accounting and establish how these changes can benefit you. We will also introduce the concept of event-based production cost posting for product costs by order.
Pic #1: Enhanced Production Accounting
The new features of
Event-Based Production Cost Posting in
Production Accounting in
SAP S/4HANA Cloud, (as shown in the picture above) enable
real-time insights and
enriched information, to follow
simplified period-closing processes for production cost control.
The new features also enable
parallel valuation for group and local accounting standards by using
Parallel Accounting. It helps you by answering relevant production accounting questions in an intelligent way.
Product Cost by Period and
Product Cost by Order are two different functions for the analysis of product costs.
Product Cost by Period enables the periodic analysis of costs at the product level.
Product Cost by Order enables you to analyze costs at production order and process order level. Please note, this blog post focuses on the introduction of the newly available event-based production cost postings made for
Product Cost by Order.
Pic #2: Footprint of Event-Based Posting
The above picture shows you the footprint of enhanced Production Accounting including the features for
Parallel Accounting, which are planned to be delivered with SAP S/4HANA Cloud in 2021.
What is event-based production cost posting?
Pic #3: Overall Process of Event-Based Posting
In
Product Cost by Order, the
production orders and
process orders are the cost objects. Costs charged to production orders and process orders are usually analyzed and settled by lot. In the past, the values for
WIP (work in process) and
variance were calculated in
Product Cost by Order at period end. As shown in the above picture,
event-based production cost posting (including
event-based WIP and
event-based variance posting) is now available to calculate
WIP and
variance immediately, instead of waiting for period close.
Event-
based posting
links cost posting to
business events, such as goods issues, goods receipts, and operation confirmation.
To be more precise,
Event-based WIP is posted as a separate journal entry during
business events, such as
goods issues and
operation confirmation. The costs of
event-based WIP can be reviewed in the Fiori Apps
Event-Based Work in Process,
Event-Based Production Costs and
Event-Based Order Costs.
Event-based variance is posted as a separate journal entry during
business events, such as
final goods receipt or
complete technically. The
event-based variance can be reviewed in the Fiori Apps
Event-Based Production Costs and Event-Based Order Costs.
Event-based production cost posting combines
transparency with a
better view of gain or loss from production, while also
reducing workloads and costs in
period-end closing. Additionally, it enables
reports on cost information at a
more detailed responsible area (for example,
work center/operation).
The scope item for
event-based production cost posting is
3F0. This scope item supports both the
Make-To-Stock and
Make-To-Order (valuated sales order stock) scenarios for
production and process orders with the
order types YBM1, YBM2, YBM3, YBM4, YBM5, YBM9, YBW1, YPK1, YQ01, YQ02. The key roles are
Cost Accountant-Production and
Plant Controller.
To understand what the
event-based production cost posting offers in more detail, watch the
video 'Introducing Event-Based Production Cost Posting'.
This video demonstrates how to do the following:
- Create a production order using the Create Production Order app
- Confirm your production order operations with the Confirm Production Operation app
- Check WIP costs in the Event-Based Production Costs app
- Post goods issues for your production order in the Post Goods Movement app
- Check WIP costs in the Event-Based Production Costs app
- Post final goods receipts for your finished production in the Post Goods Movement app
- Check both variance and cleared WIP in the Event-Based Production Costs app
What are the key features?
Pic #4: Event-Based Posting End-to-End Process
As shown in the picture above, the key features of event-based production cost posting are the following:
- Event-based posting (including event-based WIP and event-based variance)
- Event-based posting error and exception handling
- Reporting on event-based WIP, event-based production costs and event-based variance
You can access the features of
event-based production cost posting using the following SAP Fiori apps:
How does event-based production cost posting work?
Pic #5: Event-Based Production Cost Posting Configuration
As demonstrated in the picture above, you can set up
event-based production cost posting using the
Event-Based WIP and Variance Posting configuration step in SAP S/4HANA Cloud to make the following settings:
- Define event-based result analysis keys and account determination rules
- Define event-based costing sheets
- Assign event-based costing sheets to planned valuation variants per plant
- Assign order-type-dependent parameters
Note: For new SAP S/4HANA Cloud customers, the event-based results analysis key and event-based costing sheet is set as default. Existing customers who are currently using BEI need to manually switch the settings to event-based production cost posting.
For more details about the configuration path and guidance please check
here (SAP Help Portal). Please follow the
3F0 scripts to complete the set-up on the logistics side in order to make sure the end-to-end process runs smoothly.
After making all required settings in the configuration steps,
event-based production cost posting is initiated when you create
order master data.
Pic #6: Order Master Data
During the creation of the
event-based production cost posting, make sure to select
RSEBW in the
RA Key (results analysis key) field. The
Event-Based Posting checkmark will be derived automatically as shown in the picture above.
Where to get more information about event-based production cost posting?