"At the manufacturing stage, between 1 and 5% of raw milk input is considered waste mainly due to system failures and quality control rejects. Further disconnect and inefficiencies flowing information between tactical and operational planning create more wastage by either having excess demand or producing the wrong product mix."
This PPO solver supports a time (sub-daily possible) bucket-based planning approach and considers constraints such as production capacity, lead time, farm milk supply profiles and maximum delay allowed in fulfilling market demands. Using this planner can work out an optimised supply plan (in the form of planned orders and stock transfer plans) to ensure the availability of materials for a defined part of your manufacturing or supply chain network.