
Inter-company purchasing is a very common business scenario in many SAP projects. In project practice, inter-company STO (or cross-company STO) is used to realize this process. Different projects have different practices:
In this document we will discuss how to use the SAP standard output type SPED, to realize the function of automatically triggering the inbound delivery after the goods issue of outbound delivery is posted. The Configuration Steps we have to maintain: Maintain Output Types: Configuration: SPRO –> IMG –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Output Control –> Output Determination –> Maintain Output Determination for Outbound Deliveries –> Maintain Output Types"SPED" is the standard Output Type.
Double click on the Output Type “SPED”. These are the standard settings for the Output Type SPED.
Maintain Output determination procedure: Configuration: SPRO –> IMG –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Output Control –> Output Determination –> Maintain Output Determination for Outbound Deliveries –> Maintain Output Determination Procedure
V10000 is the Standard Procedure. We can Create the New procedure by clicking on the New Entries or by Copying from the standard one. Select the Procedure and click on the control data field as shown.
We can assign the condition type as “SPED” by clicking on the New Entries as shown. Enter Step as –> 50, Count as –> 1.
After Maintaining the data click on the save button.
Remember that for the requirement 408/1, the inbound delivery will be triggered AFTER goods issue posting for outbound delivery. Assign Output Determination Procedures: Configuration: SPRO –> IMG –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Output Control –> Output Determination –> Maintain Output Determination for Outbound Deliveries –> Assign Output Determination Procedures
Assign Output Type as “SPED” to the Output Determination Procedure and delivery Type. After Completion of assigning click on the save button.
Maintain the Condition Record: Enter output Type as “SPED”.
Make sure that the value of the field Partner cannot be empty in this condition record. After Maintaining the required data click on the save button.Assign Receiving Point for Inbound Deliveries: Configuration: SPRO –> IMG –> Logistics Execution –> Shipping –> Basic Shipping Functions –> Shipping Point and Goods Receiving Point Determination –> Assign Goods Receiving Points for Inbound Deliveries
We can maintain the Shipping Points to the Plant and storage location by clicking on the New Entries or by copying from the standard one.
After Assign the data click on the save button. Set Up Confirmation Control: Configuration: SPRO –> IMG –> Material Management –> Purchasing –> Confirmations –> Set UP Confirmation control
We can create the Confirmation Control Key by clicking on the New Entries or by Copying from the Standard one. Select the Confirmation Control Key and click on the Confirmation Sequence.
Standard PO created under the number 4500000902.
We can check whether our Output Type is triggered for Outbound Delivery in VL03N.Now check whether the inbound Delivery number is triggered or not in the Purchase Order. (Go to ME23N). The inbound delivery number is automatically triggered in the Purchase order.
Remaining process is same, The Receiving Plant will do the MIGO. Check the inbound Delivery in VLO3N.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
4 | |
3 | |
2 | |
2 | |
2 | |
2 | |
2 | |
2 | |
1 | |
1 |