Master Data | Used in | ECC | SAP S/4HANA |
Bill Of Material | In-house production | Mandatory | Mandatory |
Routing | In-house production | Mandatory | Mandatory |
Production Version | In-house production | Optional | Mandatory |
Source List | External Procurement | Mandatory | Optional |
Purchasing Info-Record | External Procurement | Mandatory | Mandatory |
Functionality | Changes in SAP S/4HANA | Business Impact |
MRP Indicator on MRP run transactions screen | The creation indicator functionality is discontinued in SAP S/4HANA. This makes a clear separation of the Production planner job and Buyer job. | The system creates the Planned order where procurement type = ‘E’ or ‘X’ and purchase requisition in case of procurement type = ‘F’ |
Field Quota Arrangement Usage (MARC- USEQU) in MRP 2 View is continued | The quota is always part of the planning run | Quota Management switching is not required. |
Purchasing Info-record with sourcing information. | The role of the source list is reduced in SAP S/4HANA. The info record with Indicator "relevant for automatic sourcing" will be considered for source determination. | The Info-record is considered as a single element to determine the source. |
Source List is no longer used for the preferred source determination in the planning run | The source list is not used for the determination of vendor | The source list use is limited to temporary block/enable the vendor for procurement. |
The Selection Method ( MARC-ALTSL) in MRP 4 is discontinued | The production version is a single source of supply for the in-house production | User is required to create the number of production version as per Bill of Material variations |
The order type attribute Routing Selection (T399X-ARBPA) in the OPL8 is discontinued. | The production version is a single source of supply for the in-house production | User is required to create the number of production version as per routings variations |
Phantom assembly | The production version with BOM details is required for the phantom BOM Explosion. | The production version is required for Phantom Assembly which will be without routing |
Subcontracting BOM | The production version is mandatory for the Subcontracting BOM explosion. | same like phantom assembly, the production version will be required for the subcontracted material |
2614920 - Sourcing priority during MRP in S/4 HANA system
2523417 - "Scheduling according to purchasing info record or agreement" indicator is simplified in S/4 HANA system
2420547 - Source Determination and Usage of MPN – Differences on S/4HANA
2592317 - How is scheduling agreement's validity date be considered during MRP
2637452 - Purchasing info record is not considered by MRP in S/4 HANA system
2268069 - S4TWL - Simplified Sourcing
2339947 - How source of supply and quota works for MRP areas in S/4HANA