
The pull list controls the in-house flow of material for supplying production with materials. The system assumes that the components required for production have already been produced in-house or procured externally and are now available to be transferred from their current storage location or bin to the production storage location.
The pull list checks the stock situation at the production storage location and calculates the quantities of missing parts. Replenishment elements can be created for these missing parts.
Here we are going to review the key master data needed to use the Pull List.
Issue location for production order
Number of the issue location from which the material is issued during the production process. Backflush is posted to this issue location if required.
Use
In production, this is the access sequence in which the determination of the production storage location occurs:
Ref.: OSS Note: 137225 - Prod. order: Issuing storage location for component
Depending on if your component is used in more than one production storage location, you could asisgn this in the material master or in the BOM or through a Supply Area. Let's supose in this example that we assign this at BOM item level.
This is maintained using t-code CS02. The production storage location is assigned at item level. Once you are in the BOM, click twice on each BOM item and go to Status/Lng Text tab:
The pull list controls the in-house flow of material for supplying production with materials. The system assumes that the components required for production have already been produced in-house or procured externally and are now available to be transferred from their current storage location or bin to the production storage location.
This automatic transfer between the current storage location to the production storage location is performed based on the stock determination strategy.
Strategies for Stock Determination
You make all the settings you require for a stock determination strategy.
You determine a strategy at plant level using the stock determination group and the stock determination rule (The terms 'rule' and 'group' correspond to the checking group and the checking rule logic in the availability check).
The customizing point for the Strategies for Stock Determination is:
SPRO --> Materials Management --> Inventory Management and Physical Inventory --> Stock Determination --> Define Strategies for Stock Determination
The stock determination group is assigned to the material in the material master record.
Suppose your business is running the following process:
Let’s create a process order and ensure the Production Storage Location is determined as expected.
Take a look of the component list. All the components have an assigned production storage location:
The warehouse responsible will move components to the shop floor (production storage location). This can be done based on process order number or entering the material and quantity to be produced (this is commonly used when the order takes several days and we only want to supply components on a daily basis for the corresponding production of the day)
In this example suppose that the first process order is: 304472 and its duration is 5 days. The corresponding finished good is: 403403 (production version: 0001) and the production line maximum capacity is 5000CS/day.
Material Staging is executed thru transaction: MF60.
The pull list checks the stock situation at the production storage location and calculates the quantities of missing parts. Replenishment elements can be created for these missing parts (this is the section at the bottom of the screen).
Let's see what is each column:
Finally.. you press Save and the components will be moved from the main warehouse to the production storage location
If necessary, limit your selection using the Global settings . Here, you have the choice between:
For example, you may choose to display components with missing quantities only in the pull list or, using the indicator Take all requirements into account , you may define that the system is to include the requirements of all orders that influence the missing parts situation. If this field is not selected, the system only includes requirements for the specific order that you entered in the missing parts calculation. Here, you can also define whether your components are staged at storage location level via direct stock transfer, or using stock transfer reservation.
You also define whether the system is to save a complete log of all the messages and whether this log is to be displayed automatically.
Here, you make the settings for the print list.
References:
Pull List - Repetitive Manufacturing (PP-REM) - SAP Library
Accessing the Pull List - Repetitive Manufacturing (PP-REM) - SAP Library
OSS Note: 137225 - Prod. order: Issuing storage location for component
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
3 | |
3 | |
2 | |
2 | |
2 | |
2 | |
2 | |
2 | |
1 |