What is Bill of Material in Production Planning?
In a simple word, Bill of Material (BOM) is a structured list of all components (raw materials, semi-finished goods, finished goods) required to manufacture a finished product. It defines the relationship between a product and its components in Production Planning and Material Requirements Planning (MRP). BOM are use in several manufacturing types such as discrete manufacturing, process manufacturing, and repetitive manufacturing in SAP system.
Example of Bill of Material table
Example of Bill of Material structure
Bill of material is used to determine the required quantity of components (MRP), defines the production process and operations for the materials in the BOM, production order who used BOM to consume components in manufacturing, and also used to calculate the material costing. SAP will calculate the price for each material in the bill of material to be included in the cost of goods manufactured.
SAP supports various BOM types depending on the production and business requirements:
Now let’s talk about how to create a BOM.
You can go to CS01 and insert the material, plant, and BOM usage.
Then, go to the BOM header.
Choose the BOM status ‘1’ if you want to set the BOM active.
Then insert the components for this material. Also choose the item category and quantity.
So that's basically how you create a BOM. Feel free to discuss more if you have any other insights or questions!
A lifetime learner,
Dafina
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
3 | |
3 | |
2 | |
2 | |
2 | |
2 | |
2 | |
1 | |
1 |