The industrial production and economic growth drives the demand both in domestic and foreign markets. High capital costs involved in the mining industry makes it vulnerable to ponder upon the volatility. The dip in the china‘s growth rate has made the key commodities like iron ore and coal to topple into the over-supply. Despite having weaker commodity prices the government is vying for their own pie and cost escalations adding the worse to it.
Rather than cost reduction and process improvement plans the miners must embark on the sustainable business environment. They might look forward to fully integrate the production and trading operations in order to generate rich end value and better price controlling.
(1) Mining- It all begins with the Site Survey and Geological Benchmarking, where several rounds of Chemical Tests and QA Tests are performed to make sure ore grade is commercially viable.
(2) , (3) & (4) - Once the quality of the ore is assessed Drilling and Blasting is carried out followed by transporting the ore lumps to the crushing site by using excavators and wheel loaders.
(5) & (6) Crushing and Screening: The large blocks of Ore are crushed into small lumps. The Crushing takes place in multiple stages like Primary Crushing, Secondary Crushing and Tertiary Crushing. After each Crushing Process there is Screening Process to separate the specific order from Non-specific Material and few additives like Binding Agents and Cleaning Agents are mixed in the process. In the final Stage of Screening i.e. Pre-Loading stage the Ore lumps are segregated according to their sizes.
(7) Large Conveyor Belts are used to move Crushed Ore from Screening Plants to the stockyard and stocks are being segregated based on the lump size. And later they are transported to port stockyard for shipment.
(8), (9), (10) & (11) loading: The Reclaimer or bucket wheel excavator is used to transport the ore stacks to SILOS and then they are unloaded into freight trains.
Module | Functions/Concerns |
Sales & Distribution | • With or without Contract |
• Export Sale Orders involving multiple currencies & sales revenues accounted in local currencies | |
|
|
| |
| |
Procurement cycle | |
• Subcontracting Cycle, Import Purchase, Scrap Disposal | |
• Issue of Tools and Explosives to Subcontract/Internal Production | |
Production Planning | • Pre-Crushing processes mapped to Mining Plant, Crushing plants, Screening Plant and Loading Plant. |
• Batch Production | |
• Usage of Batch Management with Batch Characteristics | |
• Make-to-Order , Make-to-Stock | |
• Planning with Final Assembly | |
• MRP generate the PR or Production orders or Subcontract Requests | |
Shipping and Transportation Planning | • High transportation cost |
• Road transport could be EHS(Environment Health and Safety)risk | |
SAP TM ( Transport Management) | • Plan transportation, track orders, calculate transportation charges |
• Subcontracting and tendering transportation services | |
Master Data | • Material Master and BOM (multiple levels) |
Quality Management | • Qualitative and Quantitative inspections |
Plant Maintenance | • Health checkup of off-highway Equipment like Hydraulic Shovels, Dumpers, excavators etc |
• Preventive and breakdown maintenance for all Equipment’s | |
Environment and Health Safety | • Industrial Hygiene and Safety component |
• Creating risk assessments, recording and processing accidents/minor injuries | |
• Handling Standard Operating Procedures and Accident Reports |