SAP S/4HANA Private Cloud has been officially released, and many new feature were delivered for production planning. From UI improvements to the MRP Cockpit Fiori apps to new Business Add-Ins available for MRP and production orders, this blog provides an overview of those new features that are available in the latest SAP S/4HANA release.

Improvements for MRP Cockpit Fiori Apps

Several improvements were delivered for the MRP Cockpit Fiori Apps Monitor Material Coverage - Net Segments (F0247A)Monitor Material Coverage - Net and Individual Segments (F2101A) and Manage Material Coverage (F0251A), bringing additional functionalities that util now were only available in the Stock/Requirements List, and also innovations that will mimic features originally available in the MRP List. 

Rescheduling and Cancelling of Proposals

Fiori Apps Monitor Material Coverage - Net Segments (F0247A) and Monitor Material Coverage - Net and Individual Segments (F2101A) were enhanced to display information about the number of rescheduling proposals that were generated for a specific material.

These apps will now display of the number of rescheduling proposals, and new filters were also introduced to allow users to filter for materials with specific rescheduling messages. The following figure shows the new fields and the new filters in the app Monitor Material Coverage.

Caetano_0-1762983539297.png
Figure 1: Rescheduling Proposals in Monitor Material Coverage

Fiori app Manage Material Coverage has been also enhanced with new actions that will help users to resolve coverage issues and make sure requirements can be met as planned:

  • Proposals to reschedule MRP elements to an earlier date (reschedule in)
  • Proposals to reschedule MRP elements to a later date (reschedule out)
  • Proposals to cancel MRP elements (cancel process)

The following figure shows and example of the action Reschedule Out, for a purchase order with a rescheduling message:

Caetano_1-1762983539298.png
Figure 2: Rescheduling actions in Manage Material Coverage

 

Last MRP Run

Fiori Apps Monitor Material Coverage and Manage Material Coverage were also enhanced to show the date of the last MRP Run, and to allow users to filter for material segments using the date of the Last MRP Run. The following figures show the filter and the field in Monitor Material Coverage and Manage Material Coverage.

Caetano_2-1762983539299.png
Figure 3: Last MRP Run in Monitor Material Coverage

 

Caetano_3-1762983539301.png
Figure 4: Last MRP Run in Manage Material Coverage

 

Planning Time Fence and Manual Firming Date

Another enhancement to the Monitor Material Coverage and Manage Material Coverage Fiori apps was the introduction of the Planning Time Fence and the possibility to set or change a Manual Time Fence.

New filters and columns for MRP type and planning time fence were added into the Material Coverage app, as we can see in the Figure below.

Caetano_4-1762983539300.png
Figure 5: Planning Time Fence and MRP Type in Monitor Material Coverage

 

As we can see in Figure 6, Fiori App Manage Material Coverage now can show the Planning Time Fence, and users will also have the possibility to edit the Planning Time Fence.  

Caetano_5-1762983539300.png
Figure 6: Planning Time Fence in Manage Material Coverage


Accept MRP Run Result

SAP S/4HANA 2025 also introduced a new feature called Accept the MRP results, allowing the planner to mark materials for which the MRP result has been already evaluated.

A new filter has been already introduced in Fiori App Monitor Material Coverage, so that the planner can filter for material segments where the MRP result has been already accepted or not, and there is also a new column called MRP Result Accepted, as we can see in Figure 7.

Caetano_6-1762983539301.png
Figure 7: MRP Result Accepted in Fiori App Monitor Material Coverage

 

Fiori app Manage Material Coverage has also been enhanced with a button that allows the planner to Accept the MRP Results, or revoke the Acceptance of MRP results, as shown in Figure 8.  

Caetano_7-1762983539304.png
Figure 8: Button Accept MRP Result in Fiori App Manage Material Coverage

 

This feature has been also introduced in both collect and individual access of the Stock/Requirements List (transactions MD04 and MD07), as I described in my blog Accept/Revoke MRP Run results in the Stock/Requirements List and MRP Fiori Apps, and it is available for earlier releases, as described in the blog. However, only as of SAP S/4HANA 2025 users will have the ability to mass Accept and Revoke the MRP Results from the Collective Access of the Stock/Requirements List, as shown in Figure 9.

Caetano_8-1762983539302.png
Figure 9: Mass acceptance of MRP results in the Stock/Requirements List.

 

Downporting new features to SAP S/4HANA 2023

Some of the new features listed above can be also introduce in SAP S/4HANA 2023 with the implementation of the following notes:

No.

SAP Note

Description

1

3586336

SAP- Production Planning- Supporting Features- Rescheduling Proposals, Planning time fence and Last MRP Run.

2

3592002

SAP- Production Planning- Rescheduling Proposals, Planning time fence and Last MRP Run in Monitor material coverage- Net & Individual segments Fiori Application ( F2101A )

3

3592003

SAP- Production Planning- Rescheduling Proposals, Planning time fence and Last MRP Run in Monitor material coverage- Net segments ( F0247A )

4

3591572

SAP- Production Planning- Rescheduling Proposals, Planning time fence and Last MRP Run in Manage material coverage Fiori Application (F0251A)

 

 

Material Requirements Planning

Technical improvements were also delivered for MRP Live in SAP S/4HANA 2025, including new BAdIs and the improvements in the integration of documents with PP/DS and IBP.

Business Transaction Events in MRP Live

SAP S/4HANA introduced a new feature in MRP Live, that allows the creation of business transaction events (BTEs) for business documents created within MRP Live (e.g. planned orders, purchase requisitions, scheduling agreements and stock transfer requisitions) enabling post-processing steps for other applications like PP/DS, IBP.

In previous releases, materials for which documents had to be integrated to PP/DS or IBP had to be planned by MRP Live in ABAP instead of HANA, because documents generated or changed by MRP were integrated by means of an RFC. With the new integration using BTE events, those materials can be planned in HANA, which an improved MRP Live performance.

For example, if we activate Advanced Planning for a material, and we choose the option PP/DS Display Only for the scope limitation, this material would be planned in ABAP by MRP Live. As of SAP S/4HANA 2025, we can use BTE events to integrate those documents, allowing the material to be planned in HANA.

The setting to activate the integration with BTE can be found in transaction PPHMRPSET, as we can see in Figure 10.

Caetano_9-1762983539303.png
Figure 10: Setting to activate Business Transaction Events in MRP Live.

New BAdIs for MRP

  • Adjustment of Planned Order Component Data during BOM Explosion (PPH_PLDORD_COMP_ADJ):  This new BAdI allows you to modify the storage location and production supply area of components in planned orders during BOM explosion in the following processes:
    • Planning run of material requirements planning and master production scheduling

    • Manual planned order creation
    • Backflush for repetitive manufacturing without planned order

  • Additional Parameters for Navigation Profile (MD_NAVIGATION_ADJUST😞 With this new BAdI you can change the parameter IDs for transactions which are maintained in Customizing activity Define Navigation Profiles. Navigation profiles enable you to navigate faster and more flexibly between transactions, and with the new BAdI you can use more than only three parameter IDs.

 

 

Shop-Floor Control

Besides the already mentioned improvements for MRP, SAP S/4HANA 2025 also brought improvements for Shop-Floor Control, including a better handling for partial consumption posted from EWM, and new technical objects, like RAP Business Objects and Data Products. 

 

Partial Consumption and Split for Error Handling for Automatic Goods Movement, COGI

SAP S/4HANA 2025 also introduced a new feature that enables partial retrograde goods issue for non-batched and non-serialized components in embedded SAP Extended Warehouse Management, checking availability in the bin of the production supply area during the manufacturing process

This feature allows postprocessing of error records from automatic goods movements (COGI transaction) only for unavailable quantities of components, and it works for discrete and repetitive manufacturing. It will enable as-is partial goods movement between SAP EWM and production during synchronous goods movement processes, increasing PSA stock control, reducing clerical work, and improving accuracy of stock data. Figure 11 shows the setting use to activate this new feature in the Production Scheduling Profile.

Caetano_10-1762983539304.png
Figure 11: Goods Issue Quantity Split setting in the Production Scheduling Profile

 

Example:

  • 3 EA of component KOMPK1-01 are available in the bin in production supply area, as shown in Figure 12.

Caetano_11-1762983539302.png
Figure 12: 3 EA of component available in the Supply Area.

 

  • Figure 13 shows that the backflush of the component for a production order requires 12 EA,

Caetano_12-1762983539304.png
Figure 13: Backflush requires 12 EA of the component.

 

  • When we post the backflush for the production order, 3 EA of component KOMPK1-01 are issued, as shown in Figure 14.

Caetano_13-1762983539305.png
Figure 14: Backflush was posted and the consumption of 3 EA has been posted.

 

  • As we have activated the Goods Issue Quantity Split in the Production Scheduling Profile, the remaining quantity of 9 EA went into Postprocessing of Error Records from Automatic Goods Movements (transaction COGI), as shown in Figure 15.

 

Caetano_14-1762983539306.pngFigure 15: Postprocessing of the remaining quantity in COGI

 

BAdI for Initialization of Order Component on Creation

With the new Business Add-In (BAdI), Order Component - Initialization on Creation (PPH_PRODORD_COMP_ADJ) you can fill the material planning relevance and the bulk indicator at the order component (reservation) level when creating an order.

 

RAP Business Objects for Production Orders

SAP S/4HANA 2025 also brought new technical objects that will help customers to make sure that custom developments are clean core compatible. New RAP Business Objects were introduced for Production Orders, Process Orders and Routings, enabling cloud-native APIs for SAP BusinessObjects in production execution and on-stack extensibility for Manufacturing.

Caetano_15-1762983539305.png
Figure 16: New Production and Process Order RAP BOs 

 

Manufacturing Data Products

A SAP data product is a pre-packaged dataset that is ready for consumption by applications for analytics, AI, and other business intelligence purposes. A comprehensive set of ERP data products sourced from SAP S/4HANA Cloud Private Edition is now available, providing structured insights into manufacturing execution:

  • Production version
  • Work center
  • Manufacturing codes
  • Production confirmation
  • Production order
  • Enterprise resource capacity
  • Production routing]

SAP API Hub provides more information about the Manufacturing Data Products.

Caetano_16-1762983539305.png

Figure 17: Manufacturing Data Products

 

See also:

Planning Time Fence and Last MRP Run

Accept Planning Result of MRP Run

Rescheduling Proposals for MRP Elements

Business Transaction Events in MRP Live

BAdI for Adjustment of Planned Order Component Data during BOM Explosion

BAdI for Allowing Additional Parameters for Navigation Profile

BAdI for Initialization of Order Component on Creation

Partial Goods Issue for Component Consumption in Manufacturing

API Hub

 

Brought to you by the SAP S/4HANA Regional Implementation Group