2023 Jan 04 7:47 AM
Hi guys,
I just want to ask because we have a requirement to move every transports that are being moved to Production and then move it to the Project landscape (N+1). See attached image.
Basically, how can we move or setup our STMS so that transports in our Production system be move to N+1 (Dev2)?
2023 Jan 04 9:43 AM
You will need to go to client 000 of both Project landcape systems and add them to the domain controller. If there are already a TMS configuration on those PL systems, you need to delete it first.
Then, on the domain controller you need to accept the connections. Then you have 2 options:
2023 Jan 04 3:57 PM
I just want to also ask, are we going to have a problem for example, we are moving transport to Production but QA is down.
2023 Jan 04 5:13 PM
2023 Jan 04 5:49 PM
Hello m14927 ,
not verified up to now, but wouldn't locking the system in the system overview be sufficient? Smaller effort than deleting and adding afterwards again (parameters etc.)...
Kind regards
Jan
2023 Jan 05 9:33 AM
2023 Feb 03 5:33 PM
Hello Philip,
I agree with Manuel's suggestion to add all system in a single domain controller. The next thing you can do is to create a Transport Group and add PRD and DEV2 in this transport group.
Therefore, target for transports moving from QAS should be Transport Group instead of PRD. This is how TR will be available in import queue of both PRD and DEV2.
Please refer the screenshot.
Let me know in case of any queries.