cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Tenant copy and follow up activities

j_bayrhammer
Participant
0 Likes
1,801

Hello,

we are searching for documentation and experiences with tenant copies. We have got regulary copies on ERP-side and therefore tenant content has to be adapted.

Now we can't find any documentation which tells us which follow up activitites are neccessary. SAP Support says we have to do all again what's in integration guide - what an effort and not competable with a "normal" system copy.

For example with a full tenant copy all users have to be maintained again - normaly users are different in accounts and authorizations between test and productive system. There are no possibilities with export / import as known from ERP system copies.

In the ERP system copy guides there is a section with follow up activities - for C4C this seems not to exist.

And if we really have to do all acitivities from integration guide again it's really scaring! Because of changing URL and logical system name there are follow up activitities in ERP and PI too!

Who can support us with a check list or experiences with follow up activities after a tenant copy? I think we're not the first company which has to do this.

Regards,

Julia

Accepted Solutions (1)

Accepted Solutions (1)

pjcools
SAP Champion
SAP Champion

Hi Julia

We created a NEW TEST C4C tenant from a copy of our C4C PRODUCTION tenant and the whole activity went very well. We found during our project that our TEST tenant became a mixture of good data and bad because initially you are trying things out to see how the various functions work. This is especially the case with C4C being so new and the fact that not a lot people know about this product as yet.

Set up overview:

- Backend ECC integration

- Backend SAP PI integration

- C4C Administration Changes

So, basic steps include:

- Change LogSysID of Communication System / Business Instance.

Make sure you are pointing to your existing TEST system. In our case it is our ECC TEST environment but previously pointed to PRODUCTION system as it was copied from PROD tenant.

Keep the UUID the same though. This will make sure the ID Mappings are copied from the Production System ID to the Test SYstem ID and save you heaps of work!

- Delete and Re-Create ALL Communication Arrangements.

You will need to create ALL new communication arrangements for all of the relevant scenarios. As part of this process you will also need to generate new certificates.

- Generate Client Certificate Key Pair (PKCS#12) from Communication Arrangement

Create and download a key pair certificate within C4C. This will need to be uploaded into the SAP PI on premise system (in our case).

- Upload C4C Key Pair (PKCS#12 file) into Java Key Store

You will need to load the above C4C certificate into the Java key store in the SAP PI test system.

- Change Value Mapping groups

Within SAP PI there will be value mapping groups that were set up to include the C4C logical system ID. This will need to be changed to the new C4C logical system provided with the new TEST tenant.

- Change C4C Receiver Communication Channels

There will be a number of receiver communication channels that were set up to point to the old tenant. You will need to update these to the NEW TEST tenant URL. Change the Target URL's and save and activate the changes.

You should then be ready to go and test out the interfaces.

Good Luck!

cheers

Phil

j_bayrhammer
Participant
0 Likes

Hi Phil,

thank you very much - this is exactly what I hoped for with my question! 🙂

We have the same scenario (ERP-PI-C4C), so your short check guide is very helpful!

Regards,

Julia

arthur_schewe
Explorer
0 Likes

Hello Phil, hello SAP Experts,

is it still necessary to completely recreate all communication agreements after a tenant copy?

In my opinion, in most cases only the systemID and paths differ. The problem is that the SystemID cannot be changed.

Wouldn't it make sense to implement a function where executing the adaptation process for the new tenant (Adapt Integration Content for New Tenant) copies the existing communication agreements and overwrites them with the new SystemID?

Or is there already a way to simplify the process just described?

Best regards

Arthur Schewe

Answers (1)

Answers (1)

j_bayrhammer
Participant
0 Likes

Still open.

j_bayrhammer
Participant
0 Likes

Still open.

Did anybody already a tenant copy?

What are the follow-up activities? Which step have to be adjusted in ERP and PI, if tenant ID and URL changes?

Regards,

Julia

ankurgodre
SAP Mentor
SAP Mentor
0 Likes

Julia,

Check this Blog for few steps you should do post change of URL or tenant copy:

Hope this helps!

BR

Ankur

j_bayrhammer
Participant
0 Likes

Hello Ankur,

thank you for the link - these is helpful for activities in ERP after tenant copy.

What about activities in tenant itself?

Where do we have to do adjustements after tenant copy?

Regards,

Julia

ankurgodre
SAP Mentor
SAP Mentor
0 Likes

Hi Julia,

In an integrated landscape, in C4C you should make sure you check the Communication System and all the Communication Arrangements to maintain all the Integration scenario.

As a general rule of thumb when getting a tenant copied you should:

1. Validate that all the Custom fielda and any Custom work or Enhancement is copied or not.

2. Check and maintain the Communication Syatem and Arrangements. Post this do connection tests.

3.Check for any Mashups if you configured any.

4. Give a check and maintain Org model and Job Positions.

5. If data copy has not been requested in tenant copy request then pweform all the data loads.

6. Lastly, do not forget to do a quick check on the configuration and your critical processes should be testwd end to end to ensure the copy has not impacted them.

BR

Ankut