price overflow issue C+ 056

Former Member
0 Likes
427

Dears,

Please advise.

We face that the material price (UOM was PAC) is overloaded during MIGO in local currency.

Then we change Basic UOM as PC, added alternative OUM PAC, and as 1 pac = 10 PC(price is divided to 10).

Then we added MM requirement to Network order as 1 pac, PR generated for 10 PC, released.

PR was added to PO for 1 pac(11 342 000 usd per pac).

X1 release is activated and PR is updated with price 11 342 000 usd per pc).

Please advise proper decision.