No BOM Explosion In Production Order for VC material

0 Kudos
1,261

No BOM Explosion In Production Order for VC material

Scenario is:

1. There is one Configurable Material(KMAT) 'ABC'

2. Which is assigned to the Material Variant(FERT)'XYZ', so 'ABC' has been assigned to 'XYZ'.

3. The material variant(XYZ) having Multiple levels of BOM's Which are phantoms material.

4. One of phantom BOM has been added a New component from validity date 4th Dec, and in same phantom BOM one of material are deleted with a validity end date is 04th Dec.

5. And both materials having the same selection dependency as per the char. values in material variant(XYZ)

6. When I checked in CS11(BOM explode) with material variant (XYZ) from the date 4th Dec, the new BOM components of phantom material are showing.

7. Same if I checked with an old date before 4th Dec in CS11, I can not see the old component.

Accepted Solutions (0)

Answers (14)

Answers (14)

Ritz
Active Contributor

kiran.dandile86,

As XYZ is a material variant it is using its parent BOM (ABC). When you made changes in BOM of ABC added and deleted components with effectivity date, does after that you updated the material variant using report “RCUUPDMATVAR” by running SE38 or transaction: CUUPDMV.

https://blogs.sap.com/2019/01/23/how-to-update-material-variant/

Please try that and check if it helps you.

Thanks

RD

Ritz
Active Contributor
kiran.dandile86

Now my understanding is your old component is deleted without using a change number so it got deleted permanently, with any date now it will now be shown in CS11.

Also , if replies help you , you can upvote those.

Thanks

RD

Ritz
Active Contributor

kiran.dandile86

I can see you used change number for 1 component but no change number for 2nd component. Also, please try to once for exploring it 10/23/2020.

Thanks

RD

Ritz
Active Contributor

kiran.dandile86,

we generally used this report when we made configuration changes to base configurable material and which may result in inconsistences for material variant.

What it sounds with your issue is more related to effectivity date and phantom explosion.

Could you please check in below mention step when old component is not available does the new component showing ?

7. Same if I checked with an old date before 4th Dec in CS11, I can not see the old component.

Thanks

RD

Ritz
Active Contributor
0 Kudos

you can send me a message through the private message here. I am not sure if the exchanging mail id is allowed as per policy here.

Thanks

RD

0 Kudos

If possible, could I get your mail id, so I can send you the problem document?

0 Kudos
ritesh.dube

Posted on

Sorry, that I have missed one thing to tell you, which is before 11/24/2020, the situation is like the old component was showing in CS11, and that time if suppose I have checked for the new component after the date 11/24/2020 in CS11, so the new component was not shown,

now the situation is the opposite, the date has been passed, and today if I look with backdated(Before 11/24/2020), the old component has gone from cs11, and the new component is showing only with the current date.

0 Kudos

ritesh.dube

Now screenshot is not uploading here I think so, but with date 10/23/2020 it is not showing the old component

0 Kudos

ritesh.dube

Posted on

Here is the Below which i executed CS11 with 10/23/2020.

0 Kudos

ritesh.dube

Posted on

Here is the Below which i executed CS11 with 10/23/2020.

0 Kudos

ritesh.dube

Old Component is not showing CC1193222: This is wrong!


0 Kudos

ritesh.dube

Posted onHi Ritesh,When I execute CS11 with an old date before 4th Dec in CS11, I can not see the OLD as well as the NEW component also.Below is the Same Scenarios that I reproduced in Test Environment with a date from 24th Nov 2020.-------------------------------------------------------------------------------------------------------------------------
  • 1.OLD Component: CC1193222 with Validity TO 24/11/2020
  • 2.NEW Component: CC1207808 With Validity FROM : 24/11/2020

  • 3. CS11, BOM Explosion with after 24th Nov.

We can see the New Component: CC1207808 : This is Correct!


  • 1.If we execute CS11 with OLD date (Before 24/11/2020), For same material Variant.

Old Component is not showing CC1193222: This is wrong!



0 Kudos
ritesh.dube

Hi Ritesh ,

Thanks for the quick answer.
As I tried to run the Program “RCUUPDMATVAR” in SE38 and select the Material variant 'XYZ', but in the output, the system showing a message to me that "No Change Possible".

Please suggest.

Thanks

Kiran

0 Kudos

Hi Ritesh,

Thanks for the quick answer.
As I tried to run the Program “RCUUPDMATVAR” in SE38 and select the Material variant 'XYZ', but in the output, the system showing a message to me that "No Change Possible".

Please suggest.

Thanks

Kiran