Acoording to SAP Help for C4C MRS Integration the procedure for MRS integration ist this procedure:
Does step 2 require both options checked or only option 2.2 and not 2.1 ?
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hi,
Only one of the options (2.1 or 2.2) should be checked. Either use C4C Resource Scheduler or use integration with MRS.
Regards,
Anshika