on 2019 Dec 27 8:11 PM
Hi All,
The scenario in our client is an Integration C4C Services with SAP ECC.
To integrate Work Tickets with SAP ERP, we have some questions about what should be done as prerequisites. To perform the integration, we are guided by the link: https://help.sap.com/viewer/5f35ee8b31e44f2786d7c2696defa2f6/1905/en-US/2b0d1720c70743b0be8a65d04f4f...
On the point in the document:
“Create a controlling scenario in IAOM1, and set the controlling type as Single-Object Controlling in IAOM2 transaction in SAP ERP.”
Our Questions are:


Our customer needs to know if these new settings will affect their current operation. They currently have service technicians who work in workshops and use ERP to perform transactions.
Best regard!
DRT
Request clarification before answering.
| User | Count |
|---|---|
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.