on 2019 Feb 16 10:29 AM
Hi all,
Since upgrading to Hybris Commerce 6.7, we are experience terrible performance when performing a reset of the Backoffice configuration (F4, reset config, F4). It takes in the area of 10 minutes (when we do not use Jrebel) and more than 15 minutes with Jrebel enabled).
I am just wondering whether anyone else observes this behaviour.
From the thread dumps, it is doing a lot of XML parsing, nothing special.
Thanks, Cristi C.
Request clarification before answering.
It is not the normal time, as it took up to a minute in hybris 6.6, on the same machines. The system runs on 24GB of memory (we run a large set of platform cache regions) and we always have about 30% free memory (for the efficiency of the G1 GC).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.