Update WBS element

Former Member
0 Kudos
5,813

Hi,

Do you guys know of an available function or bapi that updates values of a WBS element?

1 ACCEPTED SOLUTION

Former Member
0 Kudos
713

Hello,

Make use of this BAPI

BAPI_PROJECT_MAINTAIN

Check this sample.

REPORT ZV_TEST_BAPI .

DATA: WA_PROJECT_DEFINITION LIKE BAPI_PROJECT_DEFINITION.

DATA: WA_PROJECT_DEFINITION_UPD LIKE BAPI_PROJECT_DEFINITION_UP.

DATA: T_METHOD_PROJECT LIKE BAPI_METHOD_PROJECT

OCCURS 0 WITH HEADER LINE.

DATA: T_WBS_ELEMENT LIKE BAPI_WBS_ELEMENT

OCCURS 0 WITH HEADER LINE.

DATA: T_WBS_ELEMENT_UPDATE LIKE BAPI_WBS_ELEMENT_UPDATE

OCCURS 0 WITH HEADER LINE.

DATA: E_MESSAGE_TABLE LIKE BAPI_METH_MESSAGE

OCCURS 0 WITH HEADER LINE.

DATA: RETURN LIKE BAPIRETURN1.

PARAMETERS: PSPID LIKE PROJ-PSPID MEMORY ID PSP.

DATA: LV_REFNUM LIKE BAPI_METHOD_PROJECT-REFNUMBER.

DATA: ITAB LIKE PRPS OCCURS 0 WITH HEADER LINE.

DATA: LV_PSPID(6).

CONCATENATE PSPID '%' INTO LV_PSPID.

SELECT * FROM PRPS INTO TABLE ITAB WHERE POSID LIKE LV_PSPID

AND STUFE BETWEEN '1' AND '3' .

CALL FUNCTION 'CONVERSION_EXIT_ABPSN_OUTPUT'

EXPORTING

INPUT = PSPID

IMPORTING

OUTPUT = PSPID.

WA_PROJECT_DEFINITION-PROJECT_DEFINITION = PSPID.

LOOP AT ITAB.

CALL FUNCTION 'CONVERSION_EXIT_ABPSN_OUTPUT'

EXPORTING

INPUT = ITAB-POSID

IMPORTING

OUTPUT = ITAB-POSID.

ADD 1 TO LV_REFNUM.

T_METHOD_PROJECT-REFNUMBER = LV_REFNUM.

T_METHOD_PROJECT-OBJECTTYPE = 'WBS-ELEMENT'.

T_METHOD_PROJECT-METHOD = 'UPDATE'.

T_METHOD_PROJECT-OBJECTKEY = ITAB-POSID.

APPEND T_METHOD_PROJECT.

T_WBS_ELEMENT_UPDATE-USER_FIELD_CHAR10_2 = 'X'.

APPEND T_WBS_ELEMENT_UPDATE.

T_WBS_ELEMENT-WBS_ELEMENT = ITAB-POSID.

T_WBS_ELEMENT-PROJECT_DEFINITION = PSPID.

IF ITAB-POSID = PSPID.

T_WBS_ELEMENT-USER_FIELD_CHAR10_2 = SPACE.

ELSE.

T_WBS_ELEMENT-USER_FIELD_CHAR10_2 = PSPID.

ENDIF.

APPEND T_WBS_ELEMENT.

ENDLOOP.

clear:T_METHOD_PROJECT.

T_METHOD_PROJECT-REFNUMBER = '000000'.

T_METHOD_PROJECT-METHOD = 'SaveAndWait'.

APPEND T_METHOD_PROJECT.

sort: T_METHOD_PROJECT,T_WBS_ELEMENT.

CALL FUNCTION 'BAPI_PROJECT_MAINTAIN'

EXPORTING

I_PROJECT_DEFINITION = WA_PROJECT_DEFINITION

I_PROJECT_DEFINITION_UPD = WA_PROJECT_DEFINITION_UPD

IMPORTING

RETURN = RETURN

TABLES

I_METHOD_PROJECT = T_METHOD_PROJECT

I_WBS_ELEMENT_TABLE_UPDATE = T_WBS_ELEMENT_UPDATE

I_WBS_ELEMENT_TABLE = T_WBS_ELEMENT

E_MESSAGE_TABLE = E_MESSAGE_TABLE.

IF RETURN-TYPE <> 'E'.

  • CALL 'BAPI_TRANSACTION_COMMIT'.

commit work.

ENDIF.

Cheers,

Vasanth

4 REPLIES 4

Former Member
0 Kudos
714

Hello,

Make use of this BAPI

BAPI_PROJECT_MAINTAIN

Check this sample.

REPORT ZV_TEST_BAPI .

DATA: WA_PROJECT_DEFINITION LIKE BAPI_PROJECT_DEFINITION.

DATA: WA_PROJECT_DEFINITION_UPD LIKE BAPI_PROJECT_DEFINITION_UP.

DATA: T_METHOD_PROJECT LIKE BAPI_METHOD_PROJECT

OCCURS 0 WITH HEADER LINE.

DATA: T_WBS_ELEMENT LIKE BAPI_WBS_ELEMENT

OCCURS 0 WITH HEADER LINE.

DATA: T_WBS_ELEMENT_UPDATE LIKE BAPI_WBS_ELEMENT_UPDATE

OCCURS 0 WITH HEADER LINE.

DATA: E_MESSAGE_TABLE LIKE BAPI_METH_MESSAGE

OCCURS 0 WITH HEADER LINE.

DATA: RETURN LIKE BAPIRETURN1.

PARAMETERS: PSPID LIKE PROJ-PSPID MEMORY ID PSP.

DATA: LV_REFNUM LIKE BAPI_METHOD_PROJECT-REFNUMBER.

DATA: ITAB LIKE PRPS OCCURS 0 WITH HEADER LINE.

DATA: LV_PSPID(6).

CONCATENATE PSPID '%' INTO LV_PSPID.

SELECT * FROM PRPS INTO TABLE ITAB WHERE POSID LIKE LV_PSPID

AND STUFE BETWEEN '1' AND '3' .

CALL FUNCTION 'CONVERSION_EXIT_ABPSN_OUTPUT'

EXPORTING

INPUT = PSPID

IMPORTING

OUTPUT = PSPID.

WA_PROJECT_DEFINITION-PROJECT_DEFINITION = PSPID.

LOOP AT ITAB.

CALL FUNCTION 'CONVERSION_EXIT_ABPSN_OUTPUT'

EXPORTING

INPUT = ITAB-POSID

IMPORTING

OUTPUT = ITAB-POSID.

ADD 1 TO LV_REFNUM.

T_METHOD_PROJECT-REFNUMBER = LV_REFNUM.

T_METHOD_PROJECT-OBJECTTYPE = 'WBS-ELEMENT'.

T_METHOD_PROJECT-METHOD = 'UPDATE'.

T_METHOD_PROJECT-OBJECTKEY = ITAB-POSID.

APPEND T_METHOD_PROJECT.

T_WBS_ELEMENT_UPDATE-USER_FIELD_CHAR10_2 = 'X'.

APPEND T_WBS_ELEMENT_UPDATE.

T_WBS_ELEMENT-WBS_ELEMENT = ITAB-POSID.

T_WBS_ELEMENT-PROJECT_DEFINITION = PSPID.

IF ITAB-POSID = PSPID.

T_WBS_ELEMENT-USER_FIELD_CHAR10_2 = SPACE.

ELSE.

T_WBS_ELEMENT-USER_FIELD_CHAR10_2 = PSPID.

ENDIF.

APPEND T_WBS_ELEMENT.

ENDLOOP.

clear:T_METHOD_PROJECT.

T_METHOD_PROJECT-REFNUMBER = '000000'.

T_METHOD_PROJECT-METHOD = 'SaveAndWait'.

APPEND T_METHOD_PROJECT.

sort: T_METHOD_PROJECT,T_WBS_ELEMENT.

CALL FUNCTION 'BAPI_PROJECT_MAINTAIN'

EXPORTING

I_PROJECT_DEFINITION = WA_PROJECT_DEFINITION

I_PROJECT_DEFINITION_UPD = WA_PROJECT_DEFINITION_UPD

IMPORTING

RETURN = RETURN

TABLES

I_METHOD_PROJECT = T_METHOD_PROJECT

I_WBS_ELEMENT_TABLE_UPDATE = T_WBS_ELEMENT_UPDATE

I_WBS_ELEMENT_TABLE = T_WBS_ELEMENT

E_MESSAGE_TABLE = E_MESSAGE_TABLE.

IF RETURN-TYPE <> 'E'.

  • CALL 'BAPI_TRANSACTION_COMMIT'.

commit work.

ENDIF.

Cheers,

Vasanth

0 Kudos
713

Hi Vasanth,

This is very helpful. I'll give you points for this. The highest one ofcourse!!!

Anyway, may I add a question. What if I want to add and delete an object like a project, WBS, network, activity and material/component. How will I do that? What method will I use? is it 'CREATE' and 'DELETE'?

Again, thank you very much.

0 Kudos
713

Hello Jackie,

Could you please have a look at the BAPI Document.


 FU BAPI_PROJECT_MAINTAIN

 ____________________________________________________

 Short text

     Edit project including networks

 Functionality

     With the Maintain BAPI of the WorkBreakdownStruct business object you
     can edit the objects of a project definition. You can also use all the
     functions of the Maintain BAPI of the Network business object.

     For more information, see Network.Maintain. With
     WorkBreakdownStruct.Maintain it is possible to edit the project
     definition, its WBS elements and their hierarchical relationships. The
     BAPI encapsulates a complete transaction in itself. As a result, several
     operations on project elements can be processed by only one call.

     The R/3 Project System determines in which order the operations are to
     be executed on the objects. The caller can choose the operations in any
     order.

     As a result, processing is very speedy and effective. However, this
     transaction concept does not include the use and combination of other
     SAP BAPIs in the same LUW.

   Procedure

     The WorkBreakdownStruct business object is a facade of the project
     definition for WBS elements and their hierarchy.

     To edit a project object, enter a command for an object type. In  addition, enter the object key and a reference to its attributes.

 In the table of the IMethodProject parameter enter the object type, the
 command and the object key. As a reference enter the index of the object
 data table of the relevant object type. In the object data table enter
 the information about the object. If necessary, use an update structure
 for the object.

 When entering the object type and method in the IMethodProject table
 remember that the entries are case-sensitive.

 To finish the transaction and store the data in the R/3 database, enter
 the Save command. If you only want to test whether the changes can be
 carried out, do not use the save command.

 In general, you cannot change the keys of objects.

 The return parameter Return indicates whether errors occurred during
 processing. After the call you find the error messages created during
 processing in the EmessageTable table.

ommands of the Object Types

 For the description of the object types Network, NetworkActivity,
 NetworkActivityElement, ActivityMilestone, and NetworkRelation, see
 Network.Maintain.

bject type: Project definition

 The Maintain BAPI must always refer to one project definition.
 Therefore, always enter the structure of a project definition in the
 IProjectDefinition parameter. Use the project definition as a key. The
 reference to the data part is always 1. Always enter the project
 definition in uppercase.

 Command: Create Enter the project definition and the project profile.
    The project profile must exist in the R/3 Project System.

    Example - Create a Project Definition in the R/3 Project System

    o   IMethodProject

        -   OBJECTTYPE = ProjectDefinition

        -   METHOD = Create

        -   OBJECTKEY = PD-TRAINING

        -   REFNUMBER = 000001

        -   OBJECTTYPE =

        -   METHOD = Save

        -   OBJECTKEY =

        -   REFNUMBER =

    o   IProjectDefinition

        -   PROJECT_DEFINITION = PD-TRAINING

        -   DESCRIPTION = Training project

        -   PROJECT_PROFILE = PPRO001

    Command: Update

    Use this command to change a project definition that already exists in
    the R/3 Project System. If you enter an update structure you can change
    individual fields without having to specify the other fields.

 Example - Changing the description of a project definition (Only the
 description is changed.)

 o   IMethodProject

     -   OBJECTTYPE = ProjectDefinition

     -   METHOD = Update

     -   OBJECTKEY = PD-TRAINING

     -   REFNUMBER = 000001

     -   OBJECTTYPE =

     -   METHOD = Save

     -   OBJECTKEY =

     -   REFNUMBER =

 o   IProjectDefinition

     -   PROJECT_DEFINITION = PD-TRAINING

     -   DESCRIPTION = Training project

     -   IProjectDefinitionUp

     -   PROJECT_DEFINITION =

     -   DESCRIPTION = X

 Command: Lock (from R/3 Release 4.6A)

 Use this command to lock a project definition. The "Master data locked"

system status is set for the project definition.

LS>Example - Locking the project definition PD-TRAINING

o   IMethodProject

    -   OBJECTTYPE = ProjectDefinition

    -   METHOD = Lock

    -   OBJECTKEY = PD-TRAINING

    -   REFNUMBER = 000001

    -   OBJECTTYPE =

    -   METHOD = Save

    -   OBJECTKEY =

    -   REFNUMBER =

IProjectDefinition

PROJECT_DEFINITION = PD-TRAINING

Command: Unlock (from R/3 Release 4.6A)

Use this command to unlock the project definition. The "Master data
locked" system status is removed from the project definition.

Example - Unlocking the project defintion PD-TRAINING<

o   IMethodProject

       -   OBJECTTYPE = ProjectDefinition

       -   METHOD = Unlock

       -   OBJECTKEY = PD-TRAINING

       -   REFNUMBER = 000001

       -   OBJECTTYPE =

       -   METHOD = Save

       -   OBJECTKEY =

       -   REFNUMBER =

   o   IProjectDefinition

       -   PROJECT_DEFINITION = PD-TRAINING

   Command: Release (from R/3 Release 4.5A)

   Releasing a project.  The system status "released" is set for the

   project definition and all WBS elements.

   Example - Releasing the project definition PD-TRAINING

   o   IMethodProject

       -   OBJECTTYPE = ProjectDefinition

       -   METHOD = Release

       -   OBJECTKEY = PD-TRAINING

 -   REFNUMBER =

 -   OBJECTTYPE =

 -   METHOD = Save

 -   OBJECTKEY =

 -   REFNUMBER =

 IProjectDefinition

 -   PROJECT_DEFINITION = PD-TRAINING

t type: WBS element

 can edit all WBS elements of a project definition. The name and key
the WBS element are identical.

er the WBS element in uppercase.

mand: Create

mple - Creating a WBS element for the project definition. Creating
ee WBS elements TRAINING, TRAINING.1 and TRAINING.2 for project
inition PD-TRAINING

 IMethodProject

 -   OBJECTTYPE = WBS-Element

 -   METHOD = Create

 -   OBJECTKEY = TRAINING

 -   REFNUMBER = 000001

  -   OBJECTTYPE = WBS-Element

  -   METHOD = Create

  -   OBJECTKEY = TRAINING.1

  -   REFNUMBER = 000002

  -   OBJECTTYPE = WBS element




  -   METHOD = Create

  -   OBJECTKEY = TRAINING.2

  -   REFNUMBER = 000003

  -   OBJECTTYPE =


  -   METHOD = Save

  -   OBJECTKEY =

  -   REFNUMBER =


  IProjectDefinition

  -   PROJECT_DEFINITION = PD-TRAINING

  -    IWbsElementTable

      -   Index = 1

      -   WBS_ELEMENT = TRAINING

      -   PROJECT_DEFINITION = PD-TRAINING

      -   DESCRIPTION = Whole project


      -   Index = 2

      -   WBS_ELEMENT = TRAINING.1

      -   PROJECT_DEFINITION = PD-TRAINING

      -   DESCRIPTION = Preparation


      -   Index = 3

      -   WBS_ELEMENT = TRAINING.2

      -   PROJECT_DEFINITION = PD-TRAINING

      -   DESCRIPTION = Execution

  Kommando: Update

  Use this command to change a WBS element that already exists in the R/3
  Project System. If you enter an update structure, you can change
  individual fields without having to specify the other fields.

  Example - Changing the description of the WBS element TRAINING.1 for the
  project definition PD TRAINING

     o   IMethodProject

         -   OBJECTTYPE = WBS element

         -   METHOD = Update

         -   OBJECTKEY = TRAINING.1

         -   REFNUMBER = 000001


         -   OBJECTTYPE =

         -   METHOD = Save

         -   OBJECTKEY =

         -   REFNUMBER =

     o   IProjectDefinition

         -   PROJECT_DEFINITION = PD-TRAINING

     o   IWbsElementTable

         -   Index = 1

         -   WBS_ELEMENT = TRAINING.1

         -   PROJECT_DEFINITION = PD-TRAINING

         -   DESCRIPTION = Preparation and documentation

     o   IWbsElementTableUpdate

         -   Index = 1

        -   WBS_ELEMENT =

        -   PROJECT_DEFINITION =

        -   DESCRIPTION = X

    Command: Delete

    Use this command to delete a WBS element that already exists in the R/3
    Project System. The WBS element receives the Deletion flag system status
    and is nor deleted physically. You cannot create a new WBS element with
    the same key.

    Example - Deleting the WBS element TRAINING.2 for the project PD
    TRAINING

    o   IMethodProject

        -   OBJECTTYPE = WBS element

        -   METHOD = Delete

        -   OBJECTKEY = TRAINING.2

        -   REFNUMBER = 000001


        -   OBJECTTYPE =

        -   METHOD = Save

        -   OBJECTKEY =

        -   REFNUMBER =


   o   IProjectDefinition

       -   PROJECT_DEFINITION = PD-TRAINING

       -   IWbsElementTable

       -   Index = 1

       -   WBS_ELEMENT = TRAINING.2

       -   PROJECT_DEFINITION = PD-TRAINING

   Command: Lock (from R/3 Release 4.6A)

   Use this command to lock a WBS element. The "Master data lock" system
   status is set for the WBS element.

   Example - Locking the WBS element TRAINING.1

   o   IMethodProject

       -   OBJECTTYPE = WBS-Element

       -   METHOD = Lock

       -   OBJECTKEY = TRAINING.1

       -   REFNUMBER = 000001


       -   OBJECTTYPE =

       -   METHOD = Save

       -   OBJECTKEY =

     -   REFNUMBER =

 o   IProjectDefinition

     -   PROJECT_DEFINITION = PD-TRAINING

 o   IWbsElementTable

     -   Index = 1

     -   WBS_ELEMENT = TRAINING.1

 Command: Unlock (from R/3 Release 4.6A)

 Use this command to unlock a WBS element. The "Master data lock" system
 status is removed from a WBS element.

 Example - Unlocking the WBS element TRAINING.1

 o   IMethodProjectIMethodProject

     -   OBJECTTYPE = WBS-Element

     -   METHOD = Unlock

     -   OBJECTKEY = TRAINING.1

     -   REFNUMBER = 000001
ECTTYPE =

     -   METHOD = Save

     -   OBJECTKEY =

     -   REFNUMBER =


     o   IProjectDefinition

         -   PROJECT_DEFINITION = PD-TRAINING

     IWbsElementTable

         -   Index = 1

         -   WBS_ELEMENT = TRAINING.1

     Command: Release (ab R/3 Release 4.5A)

     Releasing a WBS element.  The system status "released" is set for the
     WBS element and all lower-level WBS elements.

     Example - Releasing the WBS element TRAINING.1

     o   IMethodProject

         -   OBJECTTYPE = WBS-Element

         -   METHOD = Release

         -   OBJECTKEY = TRAINING.1

         -   REFNUMBER = 000001

         -   OBJECTTYPE =

         -   METHOD = Save

         -   OBJECTKEY =

         -   REFNUMBER =


     o   IProjectDefinition

         -   PROJECT_DEFINITION = PD-TRAINING


     o   IWbsElementTable

         -   Index = 1

         -   WBS_ELEMENT = TRAINING.1

   Object type: WBS milestone (from R/3 Release 4.6A)

     The key for the object WBS milestone is the milestone number.

     Command: Create

     Use this command to create a new WBS milestone for a network. It is not
     necessary to enter a number for the milestone. The system gives the
     milestone a number when it is created. The system returns the milestone
     in the message table as an information message.



     If however, an external number is entered in the method table, both the
     external and the new milestone number are returned in an information a
     message in the message table. A WBS element always has to be entered.

     Example - Creating a new WBS milestone for a WBS element TRAINING.2

     o   IMethodProject

         -   OBJECTTYPE = WBS milestone

         -   METHOD = Create

         -   OBJECTKEY =

         -   REFNUMBER = 000001


         -   OBJECTTYPE =

         -   METHOD = Save

         -   OBJECTKEY =

         -   REFNUMBER =


     o   IWbsMilestoneTable

         -   Index = 1

         -   MILESTONE_NUMBER =

         -   WBS_ELEMENT = TRAINING.2

     Command: Update

     Use this command to change a WBS element that already exists in the
     Project System.  It is always necessary to enter the project definition,
     if you do not explicitly change the project definition. Use the update
     structure as for WBS elements.

     Example - Changing an existing WBS milestone with the number
     000000002098 assigned to WBS element TRAINING.2.

     o   IMethodProject

         -   METHOD = Create

         -   OBJECTKEY =

         -   REFNUMBER = 000001


         -   OBJECTTYPE =

         -   METHOD = Save

         -   OBJECTKEY =

         -   REFNUMBER =


     o   IWbsMilestoneTable

         -   Index = 1

         -   MILESTONE_NUMBER =

         -   WBS_ELEMENT = TRAINING.2

     Command: Update

     Use this command to change a WBS element that already exists in the
     Project System.  It is always necessary to enter the project definition,
     if you do not explicitly change the project definition. Use the update
     structure as for WBS elements.

     Example - Changing an existing WBS milestone with the number
     000000002098 assigned to WBS element TRAINING.2.

     o   IMethodProject

   Kommando: Delete

   Use this command to delete a WBS milestone that already exists in the
   R/3 Project System. The milestone is deleted physically. It is always
   necessary to enter the project definition, if you do not explicitly
   change the project definition.

   Example - Deleting a WBS element with the number 000000002098 assigned
   to WBS element TRAINING.2.

   o   IMethodProject

       -   OBJECTTYPE = WBS milestone

       -   METHOD = Delete

       -   OBJECTKEY = 000000002098

       -   REFNUMBER = 000001

       -   OBJECTTYPE =

       -   METHOD = Save

       -   OBJECTKEY =

       -   REFNUMBER =


   o   IWbsMilestoneTable

       -   MILESTONE_NUMBER = 000000002098

       -   WBS_ELEMENT = TRAINING.2

 Object type: WBS hierarchy

 The WBS hierarchy object type defines the hierarchy of the WBS elements.
 A project definition always has exactly one hierarchy. If the position
 of a WBS element changes, the whole hierarchy has to be rebuilt.
 Therefore, the WBS hierarchy object type has only one command: Create.
 Every WBS element receives exactly one entry in the table parameter
 IWbsHierarchieTable with which it defines its position.

 Command: Create

 Use this command to create or change a WBS element hierarchy for a
 project definition. Enter the WBS hierarchy object type and the Create
 command in the table of the IMethodProject parameter. The command refers
 to all entries in the table of the IWbsHierarchieTable parameter that
 contains the data for the data for the hierarchy. Each entry in the
 IWbsHierarchieTable refers to a WBS element that describes its position
 relative to the other WBS elements.

 Example - Positioning WBS elements TRAINING , TRAINING.1 and TRAINING.2
 . (WBS elements TRAINING.1 and TRAINING.2 are subordinate to WBS element
 TRAINING. WBS element TRAINING1 is positioned on the left of
 TRAINING.2.)

 o   IMethodProject

     -   OBJECTTYPE = WBS-Hierarchy

     -   METHOD = Create

     -   OBJECTKEY =

     -   REFNUMBER =


     -   OBJECTTYPE =

       -   METHOD = Save

       -   OBJECTKEY =

       -   REFNUMBER = I


   o   ProjectDefinition

       -   PROJECT_DEFINITION = PD-TRAINING


   o   IWbsHierarchieTable

       -   WBS_ELEMENT = TRAINING

       -   PROJECT_DEFINITION = PD-TRAINING

       -   UP =

       -   DOWN = TRAINING.1

       -   LEFT =

       -   RIGHT =


       -   WBS_ELEMENT = TRAINING.1

       -   PROJECT_DEFINITION = PD-TRAINING

       -   UP = TRAINING

       -   DOWN =

       -   LEFT =
        -   RIGHT = TRAINING.2


        -   WBS_ELEMENT = TRAINING.2

        -   PROJECT_DEFINITION = PD-TRAINING

        -   UP = TRAINING

        -   DOWN =

        -   LEFT = TRAINING.1

        -   RIGHT =

Further Information

    For more information, see the R/3 Library under PS Project System ->
    Structures -> EPS Interface

Parameter

    I_PROJECT_DEFINITION
    I_PROJECT_DEFINITION_UPD
    RETURN
    I_METHOD_PROJECT
    I_WBS_ELEMENT_TABLE_UPDATE
    I_WBS_ELEMENT_TABLE
    I_WBS_MILESTONE_TABLE
    I_WBS_MILESTONE_TABLE_UPDATE
    I_WBS_HIERARCHIE_TABLE
    I_NETWORK
    I_NETWORK_UPDATE
    I_ACTIVITY
    I_ACTIVITY_UPDATE
     I_RELATION
     I_RELATION_UPDATE
     E_MESSAGE_TABLE
     I_ACTIVITY_ELEMENT
     I_ACTIVITY_ELEMENT_UPDATE
     I_ACTIVITY_MILESTONE
     I_ACTIVITY_MILESTONE_UPDATE

 Exceptions

 Function group

     2054

Cheers,

Vasanth

Former Member
0 Kudos
713

HI,,

Hi,

Use BAPI BAPI_INTERNALORDER_CREATE. To add custom field, you have to user the table EXTENSIONIN of this BAPI. But before that you will have to extend AUFK using append structure CI_AUFK ( enhancement COOPA003 )

This what SAP says about this table.

You can use this parameter to transfer user-defined fields from order master records. However, no fields are supported that are updated in user-defined tables. Only the user-defined fields created within the framework of the SAP enhancement COOPA003 that are updated automatically in table AUFK are supported. This means you must use the table extension BAPI_TE_AUFK

The enhancement COOPA_01 includes the function module EXIT_SAPLRKIO_001, in which checks of the user-defined fields can be implemented.

The documentation to the structure BAPIPAREX that this parameter is based on contains more information about the use of this parameter.

This is how you populate this table. Check this code

code----


-


DATA: gt_ci_aufk LIKE bapi_te_aufk

OCCURS 0 WITH HEADER LINE.

DATA: gt_extensionin LIKE bapiparex

OCCURS 0 WITH HEADER LINE.

DATA: lst_ci_aufk LIKE ci_aufk.

Five variables used to handle the structure length changes

DATA: lv_length TYPE i,

lv_length1 TYPE i,

lv_length2 TYPE i,

lv_length3 TYPE i,

lv_length4 TYPE i.

FIELD-SYMBOLS <f> LIKE bapi_te_aufk.

DESCRIBE FIELD <f> LENGTH lv_length.

IF lv_length > 720.

lv_length4 = lv_length - 720.

lv_length3 = 240.

lv_length2 = 240.

lv_length1 = 240.

ELSEIF lv_length > 480 AND lv_length <= 720.

lv_length3 = lv_length - 480.

lv_length2 = 240.

lv_length1 = 240.

ELSEIF lv_length > 240 AND lv_length <= 480.

lv_length2 = lv_length - 240.

lv_length1 = 240.

ELSEIF lv_length <= 240.

lv_length1 = lv_length.

ENDIF.

move custom field

lst_ci_aufk-field1 = 'field1 data'.

lst_ci_aufk-field2 = 'field2 data'.

lst_ci_aufk-field3 = 'field3 data'.

lst_ci_aufk-field4 = 'field4 data'.

move order number

gt_ci_aufk-orderid = 'iternal order no'. "In create node keep this blank

move custom fields

MOVE-CORRESPONDING lst_ci_aufk TO gt_ci_aufk.

This is for the EXTENSIONIN (Custom fields structiure - CI_AUFK)

LOOP AT gt_ci_aufk.

gt_extensionin-structure = 'BAPI_TE_AUFK'.

IF lv_length1 > 0.

MOVE gt_ci_aufk+0(lv_length1) TO gt_extensionin-valuepart1.

ENDIF.

IF lv_length2 > 0.

MOVE gt_ci_aufk+240(lv_length2) TO gt_extensionin-valuepart2.

ENDIF.

IF lv_length3 > 0.

MOVE gt_ci_aufk+480(lv_length3) TO gt_extensionin-valuepart3.

ENDIF.

IF lv_length4 > 0.

MOVE gt_ci_aufk+720(lv_length4) TO gt_extensionin-valuepart4.

ENDIF.

APPEND gt_extensionin.

ENDLOOP.

-


plzz reward if it is usefull dont forget to reward plzz