2009 Jan 23 8:17 AM
Hi,
I have created a LSMW project, but I need to move the sub project to another project on the same system/client. How can I do that? I have tried to do that over the administration, but if I do so, it only copies the elements, but for example the conversion rules are missing...
Is it possible to export/import only a sub project and then choose, in which project I want to import it?
Thank you!
2009 Jan 23 8:22 AM
Yes, export/import should work. But you have to make sure that you also copy all relevant reusable rules, recordings etc. as these are stored on project level.
Thomas
2009 Jan 23 8:22 AM
Yes, export/import should work. But you have to make sure that you also copy all relevant reusable rules, recordings etc. as these are stored on project level.
Thomas
2009 Jan 23 8:31 AM
Hi Thomas,
thank you... But when I import, I can not change the project in which I want to upload the data. The project name of the project, which I have exported, can't be changed while importing...
Or is that possible in any way?
2009 Jan 23 8:36 AM
There is a button "Import under another name" after you selected the import file, give it a try.
Ultima ratio would be to edit the file itself before import...handle with care
Thomas
2009 Jan 23 9:43 AM
Hi Thomas,
the problem is, when I choose the option to "import with different name", it always says,
that the project is still existing. That's true! But I just want to import another sub project...
Changing the file could be too difficult as it would be corrupted, when I just forget one
keyword.
Thank you
2009 Jan 23 9:50 AM
You can mark the objects that you want to import before hitting the button. Include only the one you want to copy. Try it in a sandbox first if possible.
Sorry, I have no further ideas after this.
Thomas
2009 Jan 23 9:53 AM
Hi,
thank you. I know, I have just marked the sub project. But when I choose "import with different name"
I just can choose the main project name. And when I choose one, which is still created, I can't import.
Ok, but thank you anyway...
2009 Jan 23 10:03 AM
You know what, this keeps bothering me, because this should be possible. I successfully copied a subproject with all its objects to a different project via administration. All conversion rules were there (spot checks). Reusable rules need to be transferred separately if needed.
Maybe you're working with an older LSMW version that has a bug in this area? Mine is 4.0.0. Maybe try searching OSS for a fix.
Thomas
2009 Jan 23 12:33 PM
Thank you for all answers....
It must be the old version of LSMW in 4.6c that has bugs.... It was not possible to copy the sub projects in administration with all elements, but when I have copied the recording separtely AFTERWARDS, it was working...
So thank you all for the help. It's amazing how just small things can end up in some time of stupid trying around...
Cheers
2009 Jan 23 12:50 PM
> It's amazing how just small things can end up in some time of stupid trying around...
That's how we learn stuff so that it sticks, isn't it?
Cheers
Thomas
2009 Jan 23 11:30 AM
goto LSMW tcode. then select GOTO---> Administration , there you have to select the program and select the copy option, you have to copy project or sub project or object , you have to what you want..