Dev client is in one Server and Prod is in another client....

How to transfer the Zreport fron Server to Prod....

Could you please give step by step for this

Edited by: satya kumar on Feb 5, 2008 5:13 AM

1 ACCEPTED SOLUTION

former_member156446
Active Contributor
0 Kudos

compose an email to your basis team with the transport number to move the server you want to move to... he will take care...

else if you have Authorization to Tr. STMS you can do by urself.. but its not prefered, Basis guy is also paid.. and he is specialist to do it..

5 REPLIES 5

former_member156446
Active Contributor
0 Kudos

compose an email to your basis team with the transport number to move the server you want to move to... he will take care...

else if you have Authorization to Tr. STMS you can do by urself.. but its not prefered, Basis guy is also paid.. and he is specialist to do it..

Former Member
0 Kudos

You can use Extended Transport Control.

Extended Transport Control is another way to set up the Transport Route so that the route is system and CLIENT specific.

In other words, when you release a change request in DEV Client 0XX it will not only automatically be added to the Import Queue for QAS but also 0X1, 0X2, of DEV.

To set this up requires the steps below:

1) Open the file TP_DOMAIN_DEV.PFL (located on your transport domain controller such as the DEV box. The file will be in usrsaptrans/bin)

Edit with notepad for each parameter on each system:

DEV/CTC = 0

Change to =1

2) Next you need to create Target Group before creating the transport route.

Create a Target Group:

Access the initial screen of the graphical or the hierarchical editor in change mode. STMS > Overview > Transport Routes (the default editor will appear, either Hierarchical or Graphical, to change the default editor : STMS > Extras > Settings > Transport Routes. You can also switch to one or the other from Goto > Graphical Editor.)

> Configuration > Display Change > (or change icon or F5)

Edit > Transport Target Groups > Create

In the dialog box, Create Target Group:

Enter a name for the target group /GR_QA/ (The name must begin and end with a forward slash /)

...and a description Targets for Consolidation route

Choose "Insert line"

Enter the required target system/client combinations

Use a separate line for each client.

Example:

Target System

Target Client

Client Name

DEV

0X1

Sandbox

DEV

0X2

Testing

QAS

0XX

Quality Assurance System

The idea is that we want to include the clients that will get an addition to their import queue when we release a change request from DEV.

Choose Transfer

Now you have to change the transport route to include the Target Group you created.

STMS > Overview > Transport Routes > F5 (change mode) Edit > Transport Routes > Delete

Now create a Transport Route with Extented Transport Control:

STMS > Overview > Transport Routes > F5 (change mode) Edit > Transport Routes > Create > Extended Transport Control icon at lower left of dialog box. > Consolidation route, enter integration system and transport layer. In Target system/client enter the SID of either an R/3 System and a client or an existing Target Group.

Each System must be specified by System and Client. The Target Group can be used for the consolidation system.

Distribute and activate the changes as usual by choosing Configuration > Distribute and activate

NOTE: After you set up Extended Transport Control there might be requests in an import queue that will show a red status in the CTL column. This is because these change requests need a client specified before they can be imported. These are old requests that were already in the queue.

From Import Queue Screen Mark the change request

Choose Request > Target Client > Set

Enter the Target Client ID and choose Enter.

To change a target client before starting an import:

Import Queue Screen > mark Change request > target client > change > enter target client id and choose enter.

Hope this helps.

Good luck!

Reward points if it is usefull ...

Girish

Former Member
0 Kudos

Hi Satya,

You should first create a transport request for your Z program.

Follow the below steps for that:

when you save it for the first time, it will open a pop-up window 'Create Object Directory Entry'.

You have to specify a package (which you have to create in SE80) and then click on 'Save'. It will now open a new window for Transport Request. Click on the button 'Create Request' (F8). It will again open a new pop-up. Give short description for TR and click on 'Save' button. It will come back to the previous window. Click on 'Continue'. Now if you save the object, it will be saved under the newly created TR.

If you need to create a TR for the existing object, you have to click on menu Goto->Object Directory Entry. Click on Change icon (F6). Then you can assign a package and the other steps are the same.

Then go to TCODE SE 09. It will show your user ID in User field. Check the check box 'Modifiable' and click on the button 'Display'. It will display the TR number that you created for the program. Now release this Transport Request through the following steps: Expand it by clicking on + . It will show a task with TR number as next number to your TR number. Place the cursor on it and click on button 'Release Directly'(F9). Then position the cursor on the above row (the main TR) and then press F9. Now, you can give this TR number to BASIS to ask them to move to Production. Once it is moved, the same program will be available in Production.

Reward points if useful.

Former Member
0 Kudos

Goto SE01 transaction

Click New

Enter the details & Transport is created

To add objects

eg. To add NEW report program

Goto SE38

Type program name & click on create

It will ask for Package name

Enter the package name & click on save

It will ask for Transport Number

Enter the transport nUmber

==> Your report program is included in the transport request

To add Existing report program in Transport request

Goto SE38

Open the program

Click GOTO=> ATTRIBUTES

Change the Package name from $TMP to correct package name

Click on Save

It will ask for transport number

Enter the number

=> Your program is included in transport request

Regards.

Former Member
0 Kudos

Hello

Check in SE01 for your Request :

SOURCE Client and TARGET Client

If Target Client is different from your Destination .

Take ur BASIS team advise on that .

Hope it Helps.

Praveen