2012 Oct 29 10:09 AM
Hello Guys,
I have a session already processed in SM35. I have processed 10,0000 (1 Lack) material records and updated their WM stock value. It was LT01 transaction.
In my file I have materials and their WM stock value which I processed earlier.
However not all material went successful, say 30 thousand materials were having errors and only 70K materials were went successful.
Now I need to reprocess for those 30 thousand material - I am having below confusion ----,
1. Can I use the same session and reprocess it?
2. Will it take only error records or all records?
3. If it takes only error records its very well for me, but if it takes all records it will take already processed 70K materials as well. So their stock will be doubled.
4. To not to take successful records again do there any another option?
Plz clarify.
I know how session works, always heard that we can reprocess session but what about already successful records? do they get processed again and again in subsequent rescheduling?
Plz help. Plz have a look on attached file.
Moderator message: basic, standard functionality -> question status removed.
Message was edited by: Thomas Zloch
2012 Oct 29 10:19 AM
Read SAP documentation (*), only records in error will be processed.
- The system skips transactions that were successfully completed. Only incorrect transactions or transactions that have not been executed are run.
Regards,
Raymond
(*) Correcting a Session in Managing Batch Input Sessions
.