Save PR number in STO when creating PR using MD02

Former Member
0 Kudos
109

Hello Experts,

I had a requirement where i need to store the PR number into the corresponding STO number when the PR is generated thru MRP run (MD02) . Can you let me know how to achieve this requirement.

At the end i need to store the STO number in PO while creating against the PR created from MRP run.

Thanks in Advance,

Satya

2 REPLIES 2

Former Member
0 Kudos
49

Use badi ME_PROCESS_REQ_CUST and pass the PR no in STO in the changing parameters.

0 Kudos
49

Hi Naveen,

Thanks for the response. When i tried to create a PR from MD02 and enable the break point in the post method of the said badi it doesnt stop. Will this Badi be called when PR is created from MD02 or is there any other activity that i'm missing apart from enabling the breakpoint

Thanks

Satya