Application Development Discussions
Join the discussions or start your own on all things application development, including tools and APIs, programming models, and keeping your skills sharp.
cancel
Showing results for 
Search instead for 
Did you mean: 

QM view with LSMW

Former Member
0 Kudos
425

Hi guys,

I am uploading QM view data with LSMW, but Inspection Setup data is not uploading, when iam recording its taking the values.... plz can any one suggest me the way... how can i go further....

thanks,

murali

1 ACCEPTED SOLUTION

former_member214131
Active Contributor
0 Kudos
109

Hi,

I have accomplished this loading step by an LSMW recording step.

-first the Material should have QM view. else the QM view is to be opened by MM01. You can use DI program - RMDATIND in LSMW for this.

-Once the QM View is available for the material, ( MARC-PSTAT CA 'Q' ) the lines in the table control for Inspection setup could be filled by the following recording sequence:

Give the material number in the initial screen & choose the basic data 1.

<b>from the basic dat 1 view, choose the "Quality Management" tab from the Tab list which you get from selecting the tablist button ( top right button ).</b>

then push the "Insp. Setup" button & fill the data & save.

Hope this helps.

Regards, Murugesh AS

3 REPLIES 3

Former Member
0 Kudos
109

plz send me gys....

0 Kudos
109

MM01

former_member214131
Active Contributor
0 Kudos
110

Hi,

I have accomplished this loading step by an LSMW recording step.

-first the Material should have QM view. else the QM view is to be opened by MM01. You can use DI program - RMDATIND in LSMW for this.

-Once the QM View is available for the material, ( MARC-PSTAT CA 'Q' ) the lines in the table control for Inspection setup could be filled by the following recording sequence:

Give the material number in the initial screen & choose the basic data 1.

<b>from the basic dat 1 view, choose the "Quality Management" tab from the Tab list which you get from selecting the tablist button ( top right button ).</b>

then push the "Insp. Setup" button & fill the data & save.

Hope this helps.

Regards, Murugesh AS