2007 Dec 19 12:49 PM
Hi,
I have an issue where the product hier is not being maintained in the sales order for some of the materials although the material master has the prod hier maintained.. The main program is SAPMV45A and I have checked all the exits in MV45AFZZ. In none of these exits the PRODH field in XVBAP is being populated. I would like top know if anyone has faced a problem like this.
cheers
Aveek
2007 Dec 19 5:20 PM
Hi Aveek
I think it is looking for sales product Hierarchy.
Check for that material in the sales view, whether value is maintained.
it is mvke-prodh.
Regards
MD