2007 Dec 26 1:35 PM
Hi all,
It is impossible to price at the material level (matnr) , when a material has a pricing reference (mvke-pmatn) set up against it
in the master datarici. P ng always look for the pref, even if a price is set up against the material and not the pref. How can
we price by material and pref
Thanks,
Rachita.
2007 Dec 26 2:01 PM
Hi,
The field used to look up at the price is defined in Access sequence. You may find a step with PMATN as material number.
If you insert a step with MATNR then the system will first look for the material, if not found (use the exclusion tick box) it
will look for the pref.
Reward points if found helpful...
Cheers,
Siva Ramakrishna.
2007 Dec 26 2:01 PM
Hi,
The field used to look up at the price is defined in Access sequence. You may find a step with PMATN as material number.
If you insert a step with MATNR then the system will first look for the material, if not found (use the exclusion tick box) it
will look for the pref.
Reward points if found helpful...
Cheers,
Siva Ramakrishna.