PM Order - Change of the "Work Center" on the operations of the order when saving the IP10

slanzetta
Participant
0 Kudos
199

Hi Experts,

After recalling the ip10 transaction and entering a Maintenance plant, I press the "Manual call" button and press the save button.

At this point, I would like to replace the order operations work center with a default value.

Can you tell me a user exit, badi, or can I use a replace to make this change?

Please suggest any possible solution.