01-11-2014 4:27 PM
Dear Gurus,
I am facing problem after reconcile 57f4 challan with material document 542 movement type , in J1ifr (annexure report ) it is not showing though challan is showing reconciled . i have check in table J_1IGRXSUB , excise group and plant is not updating against this material document. please guide.....
Thanks & Regards
Akshay
01-23-2014 6:39 PM
Dear All ,
My problem is solved by applying Note 1915080 , now 542 document no. is updating in j1ifr after challan reconciliation.
01-11-2014 4:52 PM
have you referred challan at the time of migo.
01-11-2014 8:26 PM
for Movement type 542 in MIGO system is not asking any excise entry (refer subcontracting challan ) as it is asking for the movement type 101.
Regards
Akshay
01-12-2014 4:25 AM
Let me assume that you have create challan and want to reverse the challan am i correct, if i am correct you have followed below steps.
Transfer Posting of Components to Subcontractor Vendor using Mvt 541,
Creation of Subcontracting Challan w.r.t. above Transfer Posting Doc(above) in J1IF01
U need cancelled transfer posting(due to wrong entry) in migo normally excise tab no excise entry or Part1 will come here just cancel it no excise entry.
then go to j1if13 reverse the challan entry
Generation of Annexure IV (J1IFR) Here in report u will see reverse entry in status field,( For u entry is not showing) in table J_1IEXCHDR table u will see status R.if this entry is not there some steps you have missed. J_1IGRXSUB is for showing reconciled quantity for posted Challans also i need tell First while Generating challan you can see entry here after reverse entry will not be there.
check this way might be useful, if problem persist revert me back.
01-15-2014 4:58 AM
Hi,
We will only reverse challan from j1if13 only after completion of 180 days.
01-14-2014 3:52 AM
Tell us the complete procedure with steps you have followed.
01-15-2014 4:28 AM
In case of subcontracting Ex. I have send 100 Pcs of material X for subcontracting I have received 75 pcs of material Y , so I reconciled challan with 75 pcs of material X , remaining 25 pc vendor sending me as it is which I am receiving with 542 movement type.
3. Do I need to develop J1ifr report or we have any alternative please suggest
also i have checked in table J_1IGRXSUB , excise group and plant is not updating in table J_1IGRXSUB against 542 material document (only challan no. and quantity is updating ) , excise group and plant should be update same as in case of 101 material document.
Regards,
Akshay Kukde
01-15-2014 4:59 AM
- Should I reconcile remaining challan quantity with 542 material document ?
- If I reconcile challan with 542 material document , in report J1IFR challan quantity is reconciled but 542 material document is not updating , it should be update same as 101 material document.
3. Do I need to develop J1ifr report or we have any alternative please suggest
1) Yes, quantity reconcialltion can be done for 542 Movement type.
2) Have you assigned the Movement type 542 in the Subcontracting CIN settings?
01-15-2014 4:35 PM
Yes , i have already assigned Movement type 542 to movement group 002 , and i am able to reconcile material document (542) with challan in j1ifQ , but when i checked in report j1ifr (1V) , it is showing challan is reconciled but against that challan material document (542) is not updating like material document with 101 movement is updating.
01-15-2014 4:54 AM
Hi,
http://scn.sap.com/docs/DOC-46959
Please check this link & make proper configuration settings.
Regards
Ragini
01-16-2014 12:44 PM
Please guide for report J1IFR , do i need to develop J1IFR or it will come through some configuration...
01-16-2014 12:50 PM
Since it is standard report no need of customization's if you want any fields to be added SAP has provided enhancement please take help of your abaper
01-18-2014 8:03 AM
Hi
in migo reference challan , the challan reference number should be done
01-18-2014 11:13 AM
In J1IFQ you ref the material document against 541 movement type and not 542 movement type.
01-23-2014 6:39 PM
Dear All ,
My problem is solved by applying Note 1915080 , now 542 document no. is updating in j1ifr after challan reconciliation.
06-29-2014 9:10 PM
1915080 note is not released,
I wonder how you have applied corrections