on 2015 Feb 19 9:37 AM
Hi,
We are configuring the GRC (V10.1 SP07) system to connect to HANA for user provisioning. To do this we have installed the plugin and performed the activities in HANA as per 1869912 - SAP GRC 10.1 Plug-In SAP HANA, SAP HANA Content.
In GRC system we have maintained connector as follows:
Here "HLE" is a logical connection in SM59 and "HANA LIVE DEV CONNECTION" is the connection to HANA in DBCO as per note 1869912.
We have also put in the "HLE" connection in the other connector configurations, integration scenarios, etc.
Now when performing the Authorization sync or the repository sync we hit an error as shown below:
The Error:
There is no Log in ST22. And in SLG1 this same error message as shown above is given, no details.
Has anyone done this successfully and can please help pointing to the right direction?
Thanks!!
Sammukh
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hello Sammukh,
Just wanted to check, if you got that resolved? We are facing the same issue.
Any help is greatly appreciated.
Thank you !
Akshat
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sammukh,
with addition to SNote#1869912,also check #1971217
Regards
Baithi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Baithi,
unfortunately the note can't be implemented at the moment.
Message no. SCWN106
SAP Note 0001971217 is incomplete.
This SAP Note cannot be imported.
Contact SAP Support
I already informed SAP Support. Waiting for response 😉
Regards,
Dirk
Dear Sammukh,
Switch on trace in ST01 and try to run the job in background to get more details,may be we will get some information.
Regards
Baithi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sammukh,
we currently face the same issue. GRAC_REPOSITORY_OBJECT_SYNC is running properly but GRAC_PFCG_AUTHORIZATION_SYNC shows the same error.
You can check SM21 or perform the trace in ST01.
In our opinion the DB connection from GRC to HANA is timed out.
We are currently checking how we can handle this.
If you have an idea or solution please provide us the information.
Thanks and best regards
Dirk
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.