<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: Meter Roll Over Scenario and Overflow Check in SAP for Utilities Discussions</title>
    <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140752#M29108</link>
    <description>&lt;P&gt;You have applied 15 to a validation class, this simply checks whether the current meter reading is lower than the previous meter reading.&lt;/P&gt;&lt;P&gt;Update the configuration at SAP Utilities --&amp;gt; Device Management --&amp;gt; Meter Reading --&amp;gt; Validations --&amp;gt; &lt;A href="https://help.sap.com/viewer/acf8f8e0bda645638370c385f572c6a9/6.18.14/en-US/4e844b08097d4453e10000000a421937.html" target="_blank"&gt;Independent Validations&lt;/A&gt; if you do not want 15 applied to reading checks. &lt;/P&gt;&lt;P&gt;use Absolute /  Relative tolerance to detect overflow, without invalidating normal roll over events. &lt;/P&gt;&lt;P&gt;Also, upgrade 4 dial metering &lt;span class="lia-unicode-emoji" title=":winking_face:"&gt;😉&lt;/span&gt;  &lt;/P&gt;</description>
    <pubDate>Sat, 13 Jun 2020 09:52:56 GMT</pubDate>
    <dc:creator>daniel_mccollum</dc:creator>
    <dc:date>2020-06-13T09:52:56Z</dc:date>
    <item>
      <title>Meter Roll Over Scenario and Overflow Check</title>
      <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140749#M29105</link>
      <description>&lt;P&gt;Hi,&lt;/P&gt;
  &lt;P&gt;Is there capability in the SAP system to identify a meter roll over scenario and not mark it implausible for overflow (validation 15)&lt;/P&gt;
  &lt;P&gt;For example, If I have a 4 dial meter - &lt;/P&gt;
  &lt;P&gt;Current Read: 9995&lt;/P&gt;
  &lt;P&gt;Next Read: 0005 (There has been a consumption of 10 units which is expected and acceptable based on system parameters.)&lt;/P&gt;
  &lt;P&gt;However, SAP still marks it as implausible as current read is less than previous read.&lt;/P&gt;
  &lt;P&gt;We need to have a check for current read being less than previous read but not for cases where it is expected the meter would roll over.&lt;/P&gt;</description>
      <pubDate>Thu, 11 Jun 2020 11:39:36 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140749#M29105</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2020-06-11T11:39:36Z</dc:date>
    </item>
    <item>
      <title>Re: Meter Roll Over Scenario and Overflow Check</title>
      <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140750#M29106</link>
      <description>&lt;P&gt;If the meter is configured with 4 dials, overflow scenarios are catered for out of the box for the example you mention. &lt;/P&gt;</description>
      <pubDate>Thu, 11 Jun 2020 23:50:02 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140750#M29106</guid>
      <dc:creator>daniel_mccollum</dc:creator>
      <dc:date>2020-06-11T23:50:02Z</dc:date>
    </item>
    <item>
      <title>Re: Meter Roll Over Scenario and Overflow Check</title>
      <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140751#M29107</link>
      <description>&lt;P&gt;Thanks for your reply Daniel. Can you clarify how this is catered?&lt;/P&gt;&lt;P&gt;Currently, if I have a scenario where the meter is expected to roll over, the system still marks the read as implausible with validation 15.&lt;/P&gt;</description>
      <pubDate>Fri, 12 Jun 2020 13:33:44 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140751#M29107</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2020-06-12T13:33:44Z</dc:date>
    </item>
    <item>
      <title>Re: Meter Roll Over Scenario and Overflow Check</title>
      <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140752#M29108</link>
      <description>&lt;P&gt;You have applied 15 to a validation class, this simply checks whether the current meter reading is lower than the previous meter reading.&lt;/P&gt;&lt;P&gt;Update the configuration at SAP Utilities --&amp;gt; Device Management --&amp;gt; Meter Reading --&amp;gt; Validations --&amp;gt; &lt;A href="https://help.sap.com/viewer/acf8f8e0bda645638370c385f572c6a9/6.18.14/en-US/4e844b08097d4453e10000000a421937.html" target="_blank"&gt;Independent Validations&lt;/A&gt; if you do not want 15 applied to reading checks. &lt;/P&gt;&lt;P&gt;use Absolute /  Relative tolerance to detect overflow, without invalidating normal roll over events. &lt;/P&gt;&lt;P&gt;Also, upgrade 4 dial metering &lt;span class="lia-unicode-emoji" title=":winking_face:"&gt;😉&lt;/span&gt;  &lt;/P&gt;</description>
      <pubDate>Sat, 13 Jun 2020 09:52:56 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140752#M29108</guid>
      <dc:creator>daniel_mccollum</dc:creator>
      <dc:date>2020-06-13T09:52:56Z</dc:date>
    </item>
    <item>
      <title>Re: Meter Roll Over Scenario and Overflow Check</title>
      <link>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140753#M29109</link>
      <description>&lt;P&gt;Hi Monis,&lt;/P&gt;&lt;P&gt;Try debugging EL28 by adding following Breakpoints.&lt;/P&gt;&lt;P&gt;EL28--&amp;gt;Go To--&amp;gt;SUB_VALID, INP_VALCHK. You should be able to understand exact bahaviour of each validation.&lt;/P&gt;&lt;P&gt;Thanks,&lt;/P&gt;&lt;P&gt;MG&lt;/P&gt;</description>
      <pubDate>Fri, 04 Sep 2020 05:47:16 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-utilities-discussions/meter-roll-over-scenario-and-overflow-check/m-p/12140753#M29109</guid>
      <dc:creator>mohit_gupta13</dc:creator>
      <dc:date>2020-09-04T05:47:16Z</dc:date>
    </item>
  </channel>
</rss>

