<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Reassign component allocation in SAP for Engineering, Construction, and Operations Discussions</title>
    <link>https://community.sap.com/t5/sap-for-engineering-construction-and-operations/reassign-component-allocation/m-p/438619#M62</link>
    <description>&lt;P&gt;Hello Team,&lt;/P&gt;&lt;P&gt;I am asking about the possibility of the reassign the allocation of a component in all materials. &lt;/P&gt;&lt;P&gt;I have a component what is used by many materials. The place of operation is changed and I have to reassign the component in all of the materials. Are there any possibility to do it easily and not one-by-one in all materials?&lt;/P&gt;&lt;P&gt;Thanks in advance for your answers!&lt;/P&gt;&lt;P&gt;Br,&lt;/P&gt;&lt;P&gt;Laszlo&lt;/P&gt;</description>
    <pubDate>Fri, 05 May 2017 14:14:20 GMT</pubDate>
    <dc:creator>Former Member</dc:creator>
    <dc:date>2017-05-05T14:14:20Z</dc:date>
    <item>
      <title>Reassign component allocation</title>
      <link>https://community.sap.com/t5/sap-for-engineering-construction-and-operations/reassign-component-allocation/m-p/438619#M62</link>
      <description>&lt;P&gt;Hello Team,&lt;/P&gt;&lt;P&gt;I am asking about the possibility of the reassign the allocation of a component in all materials. &lt;/P&gt;&lt;P&gt;I have a component what is used by many materials. The place of operation is changed and I have to reassign the component in all of the materials. Are there any possibility to do it easily and not one-by-one in all materials?&lt;/P&gt;&lt;P&gt;Thanks in advance for your answers!&lt;/P&gt;&lt;P&gt;Br,&lt;/P&gt;&lt;P&gt;Laszlo&lt;/P&gt;</description>
      <pubDate>Fri, 05 May 2017 14:14:20 GMT</pubDate>
      <guid>https://community.sap.com/t5/sap-for-engineering-construction-and-operations/reassign-component-allocation/m-p/438619#M62</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2017-05-05T14:14:20Z</dc:date>
    </item>
  </channel>
</rss>

