<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:taxo="http://purl.org/rss/1.0/modules/taxonomy/" version="2.0">
  <channel>
    <title>topic Re: FOR loop in ABAP Code ? in Application Development and Automation Discussions</title>
    <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292902#M1533039</link>
    <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi, &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks, but I need attach to existing compilable code..as I said in the post.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;These are compilable statements, How do we add that extra 1, 2, 3.... in a a loop same time it should be compiled.&lt;/P&gt;&lt;P&gt;Please assume below is the code need to be in loop...!!&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Actual declaration without ABAP loop used.&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp1 TYPE wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;DATA it_nd1 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;DATA wa_nd1 TYPE wd_this-&amp;gt;Element_nd_tmp1. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;if i=2&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;DATA it_nd2 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;DATA wa_nd2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Actual declaration with ABAP loop used.(to attach 1,2,3...etc..dynamically. Just for example I added "+i" below)&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;DO&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp&lt;EM&gt;i  TYPE wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i.&lt;/P&gt;&lt;P&gt;DATA it_nd&lt;EM&gt;i TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i.&lt;/P&gt;&lt;P&gt;DATA wa_nd&lt;EM&gt;i TYPE wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;i++&lt;/P&gt;&lt;P&gt;END.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Something similar to the above is possible ?&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;&lt;P&gt;Praveen&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
    <pubDate>Thu, 23 Sep 2010 08:29:23 GMT</pubDate>
    <dc:creator>praveenkumar_kadi</dc:creator>
    <dc:date>2010-09-23T08:29:23Z</dc:date>
    <item>
      <title>FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292900#M1533037</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;I am working on a ABAP requirement, where I need to use a dynamic variable attached to a compilable code.&lt;/P&gt;&lt;P&gt;For ex:&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;In Jave we use&lt;/P&gt;&lt;P&gt;for( i=0; i &amp;gt;n; i++){&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;int i=0;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;stmti+stmti = result;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;}&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Here  i  is an dynamic variable and it will be keep on changing ATTACHED TO stmti as stmt1.stmt2....etc. whenever there is a &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;change in i.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;In ABAP, I have below code to attach:- Here I need to change from 1 to 100 like below. currently I see it as re-work, if i put the code each time changing manually. so I want make it in a loop and so dynamic and hence less code. How to achieve this. Please &lt;/P&gt;&lt;P&gt;help. Any ABAP string functions to be used?&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;if i=1&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp1 TYPE wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;   DATA it_nd1 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;   DATA wa_nd1 TYPE wd_this-&amp;gt;Element_nd_tmp1. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;if i=2&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;   DATA it_nd2 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;   DATA wa_nd2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;&lt;P&gt;Praveen&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Edited by: Praveen kumar Kadi on Sep 23, 2010 9:59 AM&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 07:58:16 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292900#M1533037</guid>
      <dc:creator>praveenkumar_kadi</dc:creator>
      <dc:date>2010-09-23T07:58:16Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292901#M1533038</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;HI,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;     Try using While Loop as : &lt;/P&gt;&lt;P&gt;           WHILE( i&amp;lt; 100)&lt;/P&gt;&lt;P&gt;                 + your  logic+&lt;/P&gt;&lt;P&gt;          increment i.&lt;/P&gt;&lt;P&gt;           ENDWHILE.&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 08:14:21 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292901#M1533038</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2010-09-23T08:14:21Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292902#M1533039</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi, &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks, but I need attach to existing compilable code..as I said in the post.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;These are compilable statements, How do we add that extra 1, 2, 3.... in a a loop same time it should be compiled.&lt;/P&gt;&lt;P&gt;Please assume below is the code need to be in loop...!!&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Actual declaration without ABAP loop used.&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp1 TYPE wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;DATA it_nd1 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;DATA wa_nd1 TYPE wd_this-&amp;gt;Element_nd_tmp1. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;if i=2&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;DATA it_nd2 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;DATA wa_nd2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Actual declaration with ABAP loop used.(to attach 1,2,3...etc..dynamically. Just for example I added "+i" below)&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;DO&lt;/P&gt;&lt;P&gt;DATA ls_nd_tmp&lt;EM&gt;i  TYPE wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i.&lt;/P&gt;&lt;P&gt;DATA it_nd&lt;EM&gt;i TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i.&lt;/P&gt;&lt;P&gt;DATA wa_nd&lt;EM&gt;i TYPE wd_this-&amp;gt;Element_nd_tmp&lt;/EM&gt;i. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;i++&lt;/P&gt;&lt;P&gt;END.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Something similar to the above is possible ?&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;&lt;P&gt;Praveen&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 08:29:23 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292902#M1533039</guid>
      <dc:creator>praveenkumar_kadi</dc:creator>
      <dc:date>2010-09-23T08:29:23Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292903#M1533040</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Give the actual requirement. &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;For ex, In  COSP table we have 16 columns for cost. Requirement is to add the columns for each of the period separately. But, we don't want to give &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;sum_wlp01 = sum_wlp01+ wa_cosp-wlp01.&lt;/P&gt;&lt;P&gt;.&lt;/P&gt;&lt;P&gt;.&lt;/P&gt;&lt;P&gt;.&lt;/P&gt;&lt;P&gt;sum_wlp16 = sum_wlp16+ wa_cosp-wlp16.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;In this case we use field symbols to make it simple. You can find threads resolving the same.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Hope it helps.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Sujay&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 08:46:13 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292903#M1533040</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2010-09-23T08:46:13Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292904#M1533041</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;In ABAP you can use the Perform statement to achieve this task.&lt;/P&gt;&lt;P&gt;Perform &amp;lt;subroutinee name&amp;gt; using ls_nd_tmp1 type wd_this-&amp;gt;Element_nd_tmp1 &lt;/P&gt;&lt;P&gt;                                                         it_nd1TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1  wa_nd1&lt;/P&gt;&lt;P&gt;                                                         wa_nd1 TYPE wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;Perform &amp;lt;subroutinee name&amp;gt; using ls_nd_tmp2 type wd_this-&amp;gt;Element_nd_tmp2 &lt;/P&gt;&lt;P&gt;                                                         it_nd2          TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp2  &lt;/P&gt;&lt;P&gt;                                                         wa_nd2       TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Perform &amp;lt;subroutinee name&amp;gt; using ls_nd_tmp100  type wd_this-&amp;gt;Element_nd_tmp100 &lt;/P&gt;&lt;P&gt;                                                         it_nd100           TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1  &lt;/P&gt;&lt;P&gt;                                                         wa_nd100       TYPE wd_this-&amp;gt;Element_nd_tmp100.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;form &amp;lt;subroutinee name&amp;gt; using p_nd_tmp  type wd_this-&amp;gt;Element_nd_tmp&lt;/P&gt;&lt;P&gt;                                                        p_it_nd    TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp &lt;/P&gt;&lt;P&gt;                                                        p_wa_nd       TYPE wd_this-&amp;gt;Element_nd_tmp.&lt;/P&gt;&lt;P&gt; &amp;lt;logic&amp;gt;&lt;/P&gt;&lt;P&gt;endform.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;regards,&lt;/P&gt;&lt;P&gt;Sakshi&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 08:50:17 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292904#M1533041</guid>
      <dc:creator>Former Member</dc:creator>
      <dc:date>2010-09-23T08:50:17Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292905#M1533042</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;Hi Sujay,&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks. Thats' same here, How do you used field symbol to replace your table numbers dynamically? same it time it should be complled.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Please post your sample code to understand better.&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Thanks&lt;/P&gt;&lt;P&gt;Praveen&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 08:51:57 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292905#M1533042</guid>
      <dc:creator>praveenkumar_kadi</dc:creator>
      <dc:date>2010-09-23T08:51:57Z</dc:date>
    </item>
    <item>
      <title>Re: FOR loop in ABAP Code ?</title>
      <link>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292906#M1533043</link>
      <description>&lt;HTML&gt;&lt;HEAD&gt;&lt;/HEAD&gt;&lt;BODY&gt;&lt;P&gt;&amp;gt; &lt;/P&gt;&lt;PRE&gt;&lt;CODE&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;&amp;gt; &lt;/P&gt;&lt;P&gt;&amp;gt; if i=1&lt;/P&gt;&lt;P&gt;&amp;gt; DATA ls_nd_tmp1 TYPE wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;&amp;gt;    DATA it_nd1 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp1.&lt;/P&gt;&lt;P&gt;&amp;gt;    DATA wa_nd1 TYPE wd_this-&amp;gt;Element_nd_tmp1. &lt;/P&gt;&lt;P&gt;&amp;gt; &lt;/P&gt;&lt;P&gt;&amp;gt; if i=2&lt;/P&gt;&lt;P&gt;&amp;gt; DATA ls_nd_tmp2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&amp;gt;    DATA it_nd2 TYPE TABLE OF wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&amp;gt;    DATA wa_nd2 TYPE wd_this-&amp;gt;Element_nd_tmp2.&lt;/P&gt;&lt;P&gt;&amp;gt; &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;/CODE&gt;&lt;/PRE&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;What are you going to do with this data once you've defined it?  I'd define an internal table with three fields - &lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;PRE&gt;&lt;CODE&gt;TYPES: BEGIN OF my_elements_ty,
        r_element1 TYPE REF TO data,
        r_element2 TYPE REF TO data,
        r_element3 TYPE REF TO data,
      END OF my_elements_ty.

DATA: lt_elements TYPE STANDARD TABLE OF my_elements_ty,
      ls_element  TYPE my_elements_ty.&lt;/CODE&gt;&lt;/PRE&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;Then, for each iteration, build the name of the element type in strings and use something like:&lt;/P&gt;&lt;PRE&gt;&lt;CODE&gt;CREATE DATA ls_element-r_element1 TYPE (the_type_in_the_string1).    
CREATE DATA ls_element-r_element1 TYPE (the_type_in_the_string2).    
CREATE DATA ls_element-r_element1 TYPE (the_type_in_the_string3).

INSERT ls_element INTO TABLE lt_elements.&lt;/CODE&gt;&lt;/PRE&gt;&lt;P&gt;    &lt;/P&gt;&lt;P&gt;But this really is advanced ABAP, and not suitable for someone who is clearly a beginner. ( Also note that these forums are not supposed to be a substitute for training - or reading an ABAP tutorial ).&lt;/P&gt;&lt;P&gt;&lt;/P&gt;&lt;P&gt;matt&lt;/P&gt;&lt;/BODY&gt;&lt;/HTML&gt;</description>
      <pubDate>Thu, 23 Sep 2010 09:01:01 GMT</pubDate>
      <guid>https://community.sap.com/t5/application-development-and-automation-discussions/for-loop-in-abap-code/m-p/7292906#M1533043</guid>
      <dc:creator>matt</dc:creator>
      <dc:date>2010-09-23T09:01:01Z</dc:date>
    </item>
  </channel>
</rss>

